Page 42 - 103
P. 42

SOCI COLLETTIVI







                                                        TERNA
                                                        Viale Egidio Galbani, 70
                                                        00156 Roma                                     PAG. 341





                                                        TREVI GROUP
                                                        Via Larga di Sant’Andrea, n. 201
                                                        47522 Cesena (FC)                              PAG. 344


                       Una storia lunga oltre 65 anni
                       Il Gruppo Trevi è leader mondiale nell’ingegneria del sottosuolo a 360 gradi (fondazioni e opere spe-
       ANNO DI FONDAZIONE  ciali, consolidamenti del terreno, recupero siti inquinati), nella progettazione e commercializzazione
                 1957  di tecnologie specialistiche del settore.   TRILLIUM PUMPS ITALY
                       Fondato a Cesena nel 1957, il Gruppo Trevi conta 65 società e, attraverso dealer e distributori, è
         CAPITALE SOCIALE                               Via M.G. Agnesi, 1
        123.044.339,55 euro  i.v.   presente in 90 paesi. Alla fine del 2021 i dipendenti sono oltre 3.000.    PAG. 346
                                                        20834 Nova Milanese (MB)
                       Fra le ragioni del successo del Gruppo Trevi ci sono l’internazionalizzazione e l’integrazione e
                       l’interscambio continuo fra innovazione tecnologica e di processo tra le due divisioni: Trevi, che
             RICAVI 2022  realizza fondazioni ed opere speciali, consolidamenti di terreni per grandi interventi infrastrutturali
            236,1 Mld euro   (metropolitane, dighe, porti e banchine, ponti e viadotti, linee ferroviarie e autostradali, edifici indu-
          al 1° semestre 2022  striali e civili) e mette insicurezza siti inquinati e Soilmec, che progetta, produce e commercializza
 (comprese le società controllate estere)  macchinari, impianti e servizi per l’ingegneria del sottosuolo.
          CERTIFICAZIONE  Fra i tanti i progetti che hanno lasciato un segno indelebile nella storia del settore ricordiamo:
           UNI EN ISO 14001  la realizzazione della diga di Ertan in Cina, il consolidamento della Torre di Pisa, la costruzione della
                                                        TRI-MER GLOBAL TECHNOLOGIES
           UNI EN ISO 45001  nuova Biblioteca di Alessandria in Egitto, le fondazioni del Ponte Vasco da Gama in Portogallo, le
           UNI EN ISO 9001  opere di fondazione del nuovo World Trade Center di New York, il consolidamento delle nicchie dei
                                                        Via Roma, 74
                       Budda di Bamiyan in Afganistan, il consolidamento della diga di Wolf Creek in Usa, il consolida-
                       mento dell’argine LPV-111 di New Orleans distrutto dall’uragano Katrina, il recupero della Costa   PAG. 348
                                                        20060 Cassina de’ Pecchi MI
                       Concordia, la nuova metropolitana (Cityringen) di Copenaghen, il centro direzionale Four Frankfurt
                       di Francoforte e la nuova linea della metropolitana di Parigi.
               ADDETTI  Nel 2016 il Gruppo ha acquisito i lavori per la messa in sicurezza della diga di Mosul in Iraq, affron-
                 3.107  tando e superando una sfida tecnologica, organizzativa e logistica estremamente complicata che
          (al 1° semestre 2022)  ha ricevuto il DFI Outstanding Project Award nel 2022.
                       Nel 2022, il Gruppo ha acquisito i lavori per l’avveniristico progetto The Line in Arabia Saudita,
                       le opere di fondazione e consolidamento per il North East Link Project, il progetto di tunneling
          CARICHE SOCIALI  nello Stato di Victoria a Melbourne in Australia e la realizzazione della cortina di consolidamento
               Presidente  e drenaggio della Rogun Main Dam Foundation in Tagikistan, una delle dighe più alte del mondo.
                                                        TURBODEN SPA
             Anna Zanardi  Il successo del Gruppo Trevi si basa sull’integrazione e quindi sullo scambio continuo fra inno-
                                                        Via Cernaia, 10
        Amministratore Delegato  vazione tecnologica e di processo tra le due divisioni costituenti il Gruppo: la divisione Trevi e la
            Giuseppe Caselli  divisione Soilmec (che progetta, produce e commercializza macchinari e impianti per l’ingegneria   PAG. 345
                                                        25124 Brescia
                       del sottosuolo).
              INDIRIZZO  A long history of over 65 years
             Via Larga, 201
          47522 Cesena (FC)  The Trevi Group is a world leader in the field of underground engineering from A to Z (special foun-
         Tel. +39 0547 319111  dations, soil consolidation, recovery of polluted sites), in the design and marketing of specialized
         Fax +39 0547 319313  technologies in the sector.
       E-mail: trevifin@trevifin.com  Set-up in Cesena in 1957, today the Trevi Group has over 65 offices and is present in more than 90
                                                        TUXOR
                       countries. The Group currently employs more than 3000 employees.
                                                        Via della Rocca, 4
         www.trevigroup.com  Internationalization, integration and the continuous exchange between its two divisions are among   PAG. 350
                       the reasons for the success of the Trevi Group: Trevi, which carries out special foundations and soil
                                                        10123 Torino
                       consolidation works for large infrastructure projects (subways, dams, ports and docks, bridges,
                       railway and highway lines, industrial and civil buildings), secures polluted sites, builds and manages
                       underground and automated car parks and Soilmec, which designs, manufactures and markets
                       machinery, systems and services for underground engineering.
       ANNUARIO ANIMP 2023/2024 ANIMP DIRECTORY 2023/2024  La capogruppo  , the foundations of the Vasco da Gama Bridge over the Tagus River in Portugal, the foundation   PAG. 351
                       Among the many projects carried out by the Group over its 65 years of activity, that have left an
                       indelible mark in the history of the sector, we remember: the construction of the Ertan Dam in China,
                       the consolidation of the Tower of Pisa, the construction of the new Library of Alexandria in Egypt
                                                        UNITERM
                       works of the new World Trade Center in New York, the consolidation of the niches of the Bamiyan
                       Buddhas in Afghanistan, the consolidation of the Wolf Creek Dam in the USA, the consolidation
                                                        Via Cilea, 29
                       of the LPV-111 levee in New Orleans, that was destroyed by hurricane Katrina, the recovery of the
                       Costa Concordia, the new Copenhagen metro, the Four Frankfurt business centre in Frankfurt and
                                                        20093 Cologno Monzese (MI)
                       the new Paris metro line.
                       In 2016, the Group acquired the works for the safety of the Mosul dam in Iraq, facing and overco-
                       ming an extremely complicated technological and organizational challenge and for which received
                       the 2022 DFI Outstanding project award.
   Trevi-Finanziaria Industriale S.p.A. (TreviFin)   In 2022, the Group acquired the works for the futuristic The Line project in Saudi Arabia, the foun-
        è quotata alla Borsa di Milano
                       project in the State of Victoria In Melbourne, Australia and the construction of the consolidation
  dal mese di luglio 1999 nel comparto Euronext  dation and consolidation works for the North East Link Project in Melbourne, the largest tunnelling
                       and drainage curtain of the Rogun Main Dam Foundation in Tajikistan, one of the highest dams in
             The parent company
                       The success of the Trevi Group is based on the integration and therefore on the continuous exchan-
     Trevi – Finanziaria Industriale S.p.A. (TreviFin)   the world.  UTC MEDITERRANEAN SRL
                       ge between technological and process innovation of the two divisions making up the Group: the
      has been listed on the Milan stock exchange   Trevi division and the Soilmec division (which designs, manufactures and markets machinery and   PAG. 352
                                                        Piazza Campetto, 1/10
         since July 1999 on Euronext Milan
                       systems for subsoil engineering).
                                                        16123 Genova
             36  36  36                                 VADO GATEWAY                                   PAG. 354
                                                        Via Aurelia 75B,
                                                        17047 Vado Ligure (SV)
   37   38   39   40   41   42   43   44   45   46   47