Page 101 - Industrial Plant 2015
P. 101

The Next 50 Years

How Adma-Opco, a major producer of offshore oil & gas in the Emirate of Abu
Dhabi, is using AVEVA software to future-proof its assets

       A bu Dhabi Marine Operating Company                                     Management System (EIMS; namely, AVEVA NETTM) is
                           (Adma-Opco) is a major producer of                  to compile everything in one place, while the As-Built
                           offshore oil & gas in the Emirate of Abu            Campaign will ensure that this accessible information is
                           Dhabi. The company prides itself on                 also accurate”.
                           being a pioneering petroleum
       organisation in this part of the world,                                 The information problem

       having completed over 45 years of oil and gas production.               Basem Elnaggar, Adma-Opco’s As-Built Campaign
                                                                               Team Leader, highlighted the severity of the problem:
       But with assets now around fifty years old, Adma’s                      “Imagine that you are working in operations and you
                                                                               need some drawings that contain information that will
       challenge is to ensure safe and productive operation for                affect the safety or the progress of a project. You start
                                                                               searching but cannot find these documents. So you
       the next fifty years.                                                   approach head office and the engineering services team,
                                                                               who may then approach individual engineers or the asset
                                          Central to the challenge of          management team. This process can take anything
                                                                               from one day to a month – and in the meantime the
                                          modernisation is the                 issue that you were trying to resolve has seen no
                                                                               progress and your ability to keep to the production
                                          development and maintenance          plan and meet deadlines is compromised. These kinds
                                                                               of situations, where the required information is not
                                          of a digital asset to support        available when it is needed, could result in project
                                                                               delays, loss of production, or even safety issues.
                                          and inform long-term life cycle      ‘Engineers must be able to trust that all the information
                                                                               they have is up to date, accurate and complete,’
                                          management of the physical           continued Basem. ‘Both original and current drawings
                                                                               must be categorised and accessible so that an engineer
                                          asset. As a result, Adma-Opco        is not working with outdated information that could lead
                                                                               to misinformed and potentially dangerous decisions.
                                          has begun its As-Built               Our As-Built Campaign is a concerted effort to make
                                                                               engineering decisions and actions faster and safer”.
                                          Campaign to provide Adma             The As-Built Campaign also aims to provide
                                                                               contractors with all the required information from the
Zakum West (Photograph courtesy of Adma- with a digital asset and develop      outset. This sharing of high-quality information would
                                                                               avoid common situations in which a contractor who
Opco)                                     a digital hub of up-to-date,         does not have that necessary information simply
                                                                               charges the company to go on site and survey a
                                          validated information that           particular area, or where the late discovery of an
                                                                               unexpected problem leads to costly contract variations
                                          accurately describes the             and delays.

                                          current condition of its super-

                                          complexes, rather than how

                                          they were designed some fifty

                                          years ago.

                                          Adma’s Engineering Services

                                          Team Leader, Mohammed

Das Island (Photograph courtesy of Adma-  Al-Amry, explained their life
Opco)                                     extension strategy: “We would

                                          not extend the life of a particular

       platform simply for the sake of doing so. Safety remains

       paramount in all operational and maintenance decisions.

       The challenges are really all centred on the age of our

       facilities. One issue was the fact that we could not be

       sure that our documentation was up to date; the

       information existed but it was scattered, making it difficult

       to integrate and access. The key objective of the

       implementation of our Engineering Information

                                                                               Industrial Plants - May 2015

                                                                                                                                          99
   96   97   98   99   100   101   102   103   104   105   106