Page 101 - 63
P. 101
Focus Impianti Industriali
R.StaHL
Hot spot … double cool
Solution for two LER (Local Equipment Room) with HVAC
(Heating Ventilation and Air Conditioners) in an hazardous area
A large manufacturer of compressors was in need
of a LER (Local Equipment Room) for one of their
projects. Stahl / Electromach received the request
to develop a solution for two LER’s with HVAC
(Heating Ventilation and Air Conditioners) suitable
for installation in a hazardous area and complete
with a fully redundant cooling system. In addition,
the HVAC units should run at all times during full
operation of the LER’s.
Our client
Our client is a leading supplier of systems for power
generation, operating in over 200 countries. They
offer a wide spectrum of products and solutions for
power generation, the efficient production of ener-
gy through the use of fossil or renewable materials
and the reliable transport of oil and gas. Their prod-
uct portfolio includes gas turbines, steam turbines,
generators and compressors. The range of com-
pressors offers long-term efficiency, availability and
reliability. Their compressors fulfil industry-specific A fully redundant HVAC package
customer requirements in the oil- and gas segment
and gas transportation through pipelines, as well Saudi-Kuwait border. The project is operated by
as in industrial applications, including air separa- Al-Khafji Joint Operations Co., a company jointly
tion. owned by Saudi Aramco and Kuwait Petroleum
The two LER’s are destined for a project in the Corp.
Middle East, called Hout Oil Fields. The field is lo-
cated in the neutral zone between Saudi Arabia Local Equipment Room
and Kuwait, about 26 miles east of Al Khafji on the Both of the Local Equipment Rooms are suitable
for installation in hazardous areas Atex Zone 2;
Gas-group IIB; temperature class T3. The system
is built for ambient temperatures between 0 and
50 °C and is fully redundant pressurized and cli-
matized.
A fully redundant HVAC package
Two independent operating HVAC units provide
the climate control and a continuous pressure of
50 Pa in the LER. In addition, the HVAC system
ensures a minimum of five air changes per hour and
an inside temperature which is between 15 and 22
°C. The units are easy to de-connect from the LER
using removable pull-out guide rails. During main-
The project Hout Oil Fields tenance of one unit, the other unit is still in opera-
Impiantistica Italiana - Maggio-Giugno 2018 97 97