Page 40 - Industrial Plants
P. 40

proposition in the engineering and construction of the
                                 “Fores Engineering has given a       critical part of the CPO process, along with all Digital
                                  significant contribution to the      and Safety systems design and delivery. Based on its

                               development and scale-up of CPO        durable experience in serving offshore clients and
                                technology to industrial maturity,    large contractors, Fores provides “tailor made
                                   and is ready to integrate its      solutions”,  not only on  the equipment  packages
                               engineering know-how with clients      (modular or plant-based),  but also on maintenance

                                 and partners in order to define       activities aiming to secure an overall lifecycle
                               competitive engineering packages       sustainability.

                             digitalisation platforms aiming to a continuous design
                             and operational improvement, at industrial level there  Literature

                             is a consistent value chain maturity to be developed   1) Air Transport Action Group, Waypoint 2050 Report,
                             to enable sustainable CAPex and OPex.    “A vision of net-zero aviation by mid-century”, April
                             While for modular small-size application Fores is   2023
                             capable to serve as one-stop-shop for a turnkey
                             delivery integrating Clients and Partners process IP,   2) Basini L., Mondelli N., Mondelli C., Furesi F,
                             for large-size applications, Fores focus its value   Impiantistica Italiana, N. 1, 2022








                             Maria Auriemma


                             Maria Auriemma is Process and Mechanical Discipline   developed a solid technical background on the full
                             Manager in Fores since 2019, leading the design and   engineering span (Feasibility study, Basic Design, FEED,
                             engineering of several challenging projects in   EPC), further contributing to Energy Transition targets,
                             Petrochemical and Oil&Gas fields. She started her   including  the  solutions’  maturity  and  scale  up  of
                             career  as Process  Engineer  in  ENI-Versalis and   Hydrogen related projects.





                             Fabio Nardone


                             Fabio Nar done is the Head of the Business Development   technological content in a very competitive arena.
                             in Fores, since 2019 leading business growth and   During his professional career, he has built up a solid
                             diversification, with a special focus on innovative   experience in technological innovation and international
                             solutions  for  the  Energy  Transition  &  Digital   strategic and commercial partnerships management,
                             Transformation. He has been working in the Energy   which are a pivotal for his current mission.
                             industry for more than 15 years in companies with high






















            INDUSTRIAL PLANTS - May 2024
    38
   35   36   37   38   39   40   41   42   43   44   45