Page 61 - 62
P. 61
• F&G (Fire & Gas) detection and extinguishing
system;
• Internal and external lighting;
• Power socket system;
• Voice and telecommunication system;
• Grounding system;
• Lightning system.
Inside the building were located all electrical equipments
that Cear as designed and manufactured as per project
requirement:
• the Engineering Workstation, hosting SCADA and
PMS System monitoring the overall electrical
power plant; Fig. 4 - The Plant
• the Interposing Relay Panels, to manage the Workstation
control and status signals between DCS Conclusion
(Distributed Control System) and the 0.38 kV LV All the modification and new installations have been
switchgear; delivered according to a specific planning and were
• the Auxiliary Service Panel, for 220 Vac auxiliary installed locally with the supervision of Cear’s specialized
service circuits (space heaters and internal lighting technicians that worked with local workforces to
of the electrical panels); complete the project on time.
• the 110 Vdc Dual Redundant Battery Charger; Cear has respected delivery time required by the
• the load shedding panel, to manage the outgoing customer and within eleven months has completed the
load shedding of 0,38 kV LV switchgears (new job, putting the customer in condition to make the
ATOLL switchgear and the existing 0.38 kV WHX start-up of the new gas plant.
LV switchgear); This ambitious target have been reached by Cear,
• two new 4000 A Low Voltage Bus Ducts to with a proper co-ordination of miscellaneous
connect the new 0.38 kV LV switchgear Incomers engineering disciplines (mechanical, electrical and
to the new 2500 kVA power transformer; instrumental) that put the Company in condition to
• a new 0.38 kV Power Motor Control Center, have a complete know-how and commitment
intelligent type, that had to manage the new field towards the Customer and its needs, taking care of
equipment (pumps, valves, compressor etc.) it from engineering to on site installation and
required by the additional gas production power completion of activities.
plant.
Alessandra Ranno
Alessandra studied Languages and Communication, she’s in charge as Sales and Marketing Manager for
then graduated in Marketing and Communication at the coordinating marketing activities, sales team and
University of Milan. She’s in Cear Srl since 2010 and implement international markets.
IndustrIal Plants - May 2018