Page 59 - 62
P. 59

“Zohr”. In fact, not only “Zohr” site, but also other
                                                     deposits already active on the Mediterranean coast, are
                                                     object of the attention of Governments that, based on
                                                     specific investment plans, are focused resources and
                                                     energy on expanding and improving the sites for the
                                                     management and production of the plants.


                                                     Finding the proper Electrical

                                                     Engineering Solution

                                                     The need to expansion and modernization of the
                                                     electrical capacity and power supply of the plants of a
                                                     strategic gas power plant in Egypt, has placed the End
                                                     User in the condition not only to physically add a new
                                                     electric station, but also to redefine the whole study of
                                                     electrical engineering and loads of all the electrical
                                                     stations present in the plant.
                                                     Cear, having worked in the past on the same site, was
                                                     called to redefine the new electrical engineering study
                                                     and its supply for the improvement of the electrical
                                                     power plant.
                                                     According to the evaluated LNG plant new electrical
                                                     power requirement for the project and after some site   Fig. 2 – A view of
                                                     survey,  Cear  in  cooperation  with  the  technical   Electrical Power
                                                     department of the Engineering Company, they defined   Module Building












            Fig. 1 – The Power Motor Control Center



                         uring the last years the oil&gas sector
                         has turned to new plant management
                         approach based on increasingly
                         frequent redevelopment of sites, an
                         improvement  and  optimization  of
            Dextraction process, growing up
            efforts in the exploration and research of new buckets
            from which to draw the raw material (subsea and shale
            gas). Thanks to these new investments, both revamping
            and exploration, the map of potential and effective
            development areas was redefined; in this territory, that
            includes some places located in the Mediterranean
            area, it was decided to invest resources and
            consequently studies for the expansion of LNG
            (Liquified Natural Gas) plants.
            In the last ten-year period, particular attention by the oil
            companies, has been focused on the Egyptian coasts,
            where we remember the recent discovery of gas field
            realized  by  Eni  in  2015,  the  now  famous  site  called


                                                                                    IndustrIal Plants - May 2018
                                                                                                                   55
   54   55   56   57   58   59   60   61   62   63   64