Page 42 - Industrial Plants
P. 42
Neftochim Burgas H-Oil Complex: Challenges and Convertible Contracts International Journal of
achievements of a complex technology project under Construction Engineering and Management 2015, 4(6):
EPC LSTK Contract, EPC RRTC Conference 248-262;
Proceedings, Moscow 2016; [5] T.C. (Kees) Berends: Developing contracting
[3] Edward R. Merrow: Industrial Megaprojects, John strategies for capital projects, Experiences from the oil
Wiley and Sons, 2011; and gas industry, Proceedings of the sixth annual
[4] Mohammad Moazzami, Reza Dehghan, George F. conference of the European Decision Sciences
Jergeas, Janaka Y. Ruwanpura: A Theoretical Institute, 2015.
Framework to Enhance the Conversion Process in
ENERGY EFFICIENCY
Stefano Polimeni FOR THE FUTURE
Stefano Polimeni is a Project Director with more than 25 Automation Engineer he moved to the project
years of experience in the oil & gas project management. management of large EPC contracts, mainly on LSTK
He holds a Msc degree in Electronic Engineering from basis, for major international clients like Lukoil, Saudi
University of Rome “La Sapienza”. His career developed Aramco, ADNOC, SOCAR, ENI, MOH, ENOC.
fully in Technip Italy where after the first assignments as
20
18
COOLING
HEATING
WATER
ENERGY
41^
MOSTRA CONVEGNO EXPOCOMFORT
13 - 16 MARZO/MARCH 2018
organizzato da / organised by
www.mcexpocomfort.it
in collaborazione con
in cooperation with
INDUSTRIAL PLANTS - May 2017
40