Page 29 - 109
P. 29

All the main companies
                 operating in the Oil and Gas
            “sector, including Technip

                 Energies, have defined
                 programs aimed at achieving
                 concrete results in the field

                 of sustainability for the entire
                 production cycle, all the way to
                 the delivery and final operation

                 of the Plant



            •   Promote the use of water from other sources
                in the measure of 50% by 2025
            •   Promote the R&D initiatives related to energy
                transition

            2.  Social
            •   Zero fatalities by 2025               fi eld of Construction and PC&C activities, the main
            •   Promote diversity and inclusion with an in-  ESG objectives can be related to the following th-
                creased presence of women in leadership   ree main topics:
                position                              1.  Reduction of Greenhouse GAS (GHG) emis-
            •   Increase social initiative for local communities   sions (scope 3) during Construction and Com-
            •   Improvement of the work and safety condition   missioning Stage. Subcontractors shall be
                for employees                            closely monitored to ensure that the best solu-
                                                         tions to reduce the carbon footprint are adop-
            3.  Governance                               ted during the construction/PC&C activities.
            •   Constant audit and monitoring for Subcon-  As  the  project  is  moving  from  Construction
                tractors in relation to ESG topics       to Commissioning phases, the environmental
            •   Equity in the responsibility and opportunities   impact will increase due to the introduction of
                distributions                            hydrocarbons in the processes and the incre-
            •   Adoption of ethical code of business     ase in the energy required to perform the star-
                                                         tup and operation stages.
                                                      2.  Improve the reuse of natural resources (e.g.
                                                         water) and reduce the waste generation
            ESG for Construction                      3.  Design and select solutions to have a minimal
                                                         impact on ecosystem.
            and PC&C
                                                      CARBON FOOTPRINT FOR CONSTRUCTION
            All the activities linked to an EPC project, including   AND PC&C
            Construction and Pre-commissiong & Commissio-  The need for evaluating the carbon footprint during
            ning (PC&C), have an environmental impact on the   the construction and PC&C activities is strictly lin-
            natural surroundings that shall be minimized. In the   ked to the creation of a robust method for asses-



















             Source: Technip Energies – Sustainability Report 2022
             https://www.technipenergies.com/sites/energies/fi les/reports/sr2022/1-Technip-Energies-Sustainability-Report-2022.html



                                                                                  Impiantistica Italiana - Gennaio-Febbraio 2024  25
   24   25   26   27   28   29   30   31   32   33   34