Page 28 - Industrial Plants
P. 28

plant is a greenfield design, while the upstream part is   production sites of Perstorp in Europe via ship
                             a challenging brownfield revamping project. Perstorp   transportation on small chemical tankers, therefore the
                             and Uniper have as technology providers Johnson   project also includes the marine loading facilities, a 4
                             Matthey, Air Products and Chemicals Inc. and Sunfire,   km pipeline connecting the storage tanks at site to the
                             respectively licensing the methanol production process   marine jetty. The project is completed by retrofitting the
                             and the partial oxidation process of biogas to produce   existing utilities and offsites, as well as the wastewater
                             synthesis gas (syngas) and for the supply of electrolysers   treatment plant which is upgraded to treat effluents
                             producing green hydrogen. According to the innovative   from the entire site with the aim to recover the amount
                             process scheme of Project Air, 200,000 tons of   of water necessary for the electrolyser.
                             methanol will be produced yearly by converting a   Wood is carrying out the Front-End Engineering Design
                             variety of sustainable and green feedstocks.  (FEED) phase of the project in complete overlap with
                             The biogas from the network is fed as main feedstock   the development of the process design packages by
                             stream to a gasifier together with oxygen and other   the  licensors  of  methanol  and  gasification  areas,
                             organic residues recovered from the existing production   elevating the degree of completeness from an
                             plants in Stenungsund. The syngas produced by partial   engineering standpoint. The final goal of the FEED is to
                             oxidation is then integrated with hydrogen carrying   reach a +/-10% cost estimate for Project Air. Such
                             gaseous streams left over from the oxo-alcohol plants.   estimate will be used by Perstorp to secure the final
                             Additional carbon feedstock, added to reach the target   investment decision in early 2025. In view of a fast
                             methanol capacity, is the captured carbon dioxide from   execution of the next detailed engineering phase, the
                             an existing amine unit. The required hydrogen for the   long lead items requisitions and tendering are
                             methanol production is sourced from external and   developed to reach the status of ready for order. At
                             nearby industrial facilities and from an electrolyser plant   FEED phase completion, Wood will prepare the
                             exploiting 30 MW of renewable electric power.  technical tender documents for the EPCm phase.
                             The produced methanol, according to the scheme   Project  Air is  an exceptional  example of  energy
                             described, is equivalent to the avoidance of greenhouse   transition  project.  In  this  paper  two  of  the  most
                             gases emissions of 500,000 tons per annum of carbon   challenging aspects of the FEED project execution are
                             dioxide. The methanol will be exported to other   summarized:  the  former  is  a  showcasing  on  the











































                             Figure 2 - Plot plan view from the 3D model developed for the gasification area of Project Air. Coloured
                             adjacent structures are the newly added ones; white elements are existing


            INDUSTRIAL PLANTS - May 2024
    26
   23   24   25   26   27   28   29   30   31   32   33