CJ ICM’s awarded scope for this project comprises handling, customs clearance and
logistics and transportation activities such as port warehousing, as well as overall heavy
handling, customs clearance and warehousing, as lifting at site for final and mechanical
well as overall heavy lifting at site for final and installation
mechanical installation. For this project alone CJ
ICM mobilized a total of 480 SPMT axles, 502 Overall a grand total of 164,196 items weighing
modular axles, 205 prime movers, five crawler 153,570 metric tons with a volume of 1,036,569
cranes with lifting capacity of up to 1,600 metric cbm were shipped. To bring the cargo from Umm
tons, as well as numerous other transportation and Qasr port to site, CJ ICM managed 8,535 container
lifting equipment. Furthermore a total of 440 transports, 610 voyages with flatbeds, 471 with
employees were deployed for this purpose, lowbeds and 240 hauls with modular trailers or
including engineers, crane operators, SPMT SPMTs (self-propelled modular transporter). 200
operators etc. In order to accommodate personnel pieces exceeded an item weight of 50 metric tons,
and equipment at site, CJ ICM also constructed with the heaviest 12 pieces ranging from 501 to
own temporary facilities. One of the major 890 metric tons.
organizational challenges was the mobilization of The 7 heaviest and most voluminous pieces
the required equipment to Iraq itself. Thanks to its transported from the port of Umm Qasr and then
existing structure CJ ICM already had a significant also installed at site were seven LPG bullets, each
presence in the country, but still hundreds of SPMT weighing up to 890 tons with 83 meters of length,
axles, modular trailers and cranes had to be 8.50 meters of width and 11 meters of height. For
brought into Iraq from around the world in due time. the transportation from port to site a total of 142
power lines had to be lifted or temporarily removed,
“CJ ICM’s awarded scope for this other obstacles such as traffic signs or lights had
project comprises logistics and to be dismantled and in order to guarantee
transportation activities such as port maneuverability of the trailer with maximum