Page 79 - Industrial Plants 2014
P. 79
14 bundles and 14 fans group induced draft
execution.
The condenser horizontal arrangement, purposely
studied for this geothermal application, is
composed by tube bundles obtained from carbon
steel round tube diameter 1 inch with aluminum
fins, mechanical bond of fins with core tube can
be achieved by embedded technology Gfin type,
tube sheet and header, welded type, in carbon
steel material, tube to tube sheet welded joint
type. The tube bundles are complete of side
frame and bracing supports in carbon steel
material hot dip galvanized surface protection.
The main purpose of the tube bundles is to
condense the vapour and collect the condensate
back to the condensate tank. All the equipments
were supplied in order to operate in a classified
area as per Atex standards. Given the harsh and
highly corrosive geothermal environment, Spig’s technology in a 56 cell installation and a 13.2 MW Fig. 4 - Spig air
engineers have considered special materials and geothermal power plant deploying a 40 cells air cooled condenser for
surface treatments for all the relevant components. cooled condenser were completed the last year, in geothermal
Spig designed the supporting steel structures, Turkey (figure 4). application, Turkey
steam manifolds and condensate piping Moreover, two energy efficient, customized Fiber
considering the seismic area in which the air Reinforced Plastic (FRP), wet cooling towers
cooled condenser is installed. The overall air cooling 14,400 m³/h, each serving a 2 × 135 MWe
cooled condenser has been designed in order to coal fired power plant to come online the first
respect the noise emission limits according to the quarter of 2014, should be also mentioned. A
local project requirements. natural draft cooling tower processing 29,600 m³
The Spig Group welcomes and takes pride of this of water per hour, to be designed and installed at
achievement in the fastest growing Turkish market a 360 MW power plant has been awarded the last
where it is playing an important role, in both wet year to Spig Sogutma.
and dry Technologies, supported by its local In the recent years Spig supplied also 25.200 m³/h
operation Spig Sogutma Sistemleri Tic Ltd Sti. design water flow natural draft cooling tower for an
3
oil refinery and a 3 × 25,000 m /h concrete cooling
tower operating at customer fullest satisfaction, at
Spig in Turkey a 6 × 165 MW coal fired power plant in Turkey.
The Spig Group has an outstanding track record in When it comes to process cooling technology both
Turkey where is actively and successfully operating wet and dry, Spig Sogutma has an impressive
by providing highly performing and environmentally experience, and a consolidated position in the
sound cooling technology suitable for a diverse country, confirmed by the many prestigious
array of applications including thermal power projects successfully accomplished for the most
plants, petroleum refineries, petrochemical industry, renowned local players.
steel mills, sugar refineries, food industry, district
cooling etc. Spig clientele is supported locally by
Spig Sogutma Sistemleri Tic Ltd Sti to offer a Spig experience in geothermal
prompt assistance for both new projects and The Spig Group has had a significant presence in
service requirements. geothermal application since the nineties of the last
Spig Sogutma has been instrumental in the award century, when developing its business with Enel,
of several cooling contracts having as scope of the Italian energy leader, owning and operating
supply cooling towers or air cooled condenser. several geothermal fields, in Italy. Through that
Among the most noteworthy dry cooling projects successful relationship still existing between the
the company has been recently involved in, is the two players, Spig had the opportunity to study and
850 MW combined cycle gas turbine power plant design the most advanced solutions, suitable to
equipped with state of the art single row tube cope with each specific requirement. In fact, Spig
technology, using 42 cells, in Turkey. A 2 × 22.5 provided Enel with several highly performing
MW geothermal ORC application using dry customized cooling towers for a total 160,000