Page 83 - Industrial Plants 2014
P. 83





Neutralisation Package Unit



in a Chemical Plant in Jordan



Cear realized a turnkey electrical and automation system to guarantee
service reliability and easy installation


Alessandra Ranno
Marketing Manager, Costruzioni Elettrotecniche Cear s.r.l.













facilities at the Eshidiya site,
which is still under
construction, for FLSmidth
Italy Mineral Processing.
Cear in fact created a
complete automation system
for the FSA (Phosphoric
Sulphuric Acid) neutralization
View of JIFCO plant package utility.
Cear began work in 2012 and
is currently in the process of
n the context of large chemical plants, supply, providing on-field support and supervision for
power and control systems play a determining installation, commissioning and start-up. This
role and facilitate optimising the performance however was essentially a “turnkey” operation
of operations in the entire process plant. This including:
applies not just to “megaplants” but also to • the development of customised electrical,
Isingle packages which form part of a more instrumental and control
complex system. system engineering; The engineering
Costruzioni Elettrotecniche Cear has been working • design and manufacturing of and design study
for more than thirty years in electrical engineering power & control shelter and started with a P&I
and automation to assist process and plant electrical equipment (MCC, process engineering
engineering companies and has many times PLC control panels, VFD document, which was
encountered the most diversified international plant panels), discussed with our
needs ranging from material handling and storing • automation software client and from which
chemical materials to the chemical treatment of development for PLC & the following key
substances derived from the main process. Scada systems; requirements
As experts in the electrical and automation fields, • supply of field junction emerged
it is not enough to simply provide electricity and boxes, local control panels,
instruments, it is both fundamental and necessary electrical and instrumental cables and, finally,
to act as a client’s partner, to learn about earthing material.
processes and to propose, if necessary, solutions The engineering and design study started with a P&I
that meet their needs and those of end-users. This process engineering document, which was
applies specifically to the realization of the discussed with our client and from which the
phosphoric acid (P O ) and sulphuric acid (H SO ) following key requirements emerged:
2 5 2 4
plant in Jordan (1500 t/day of phosphoric acid • service reliability;
and 4500 t/day of sulphuric acid) and related • the “high” availability of an automation system;

IndustrIal Plants - May 2014
79
   78   79   80   81   82   83   84   85   86   87   88