11/62 plan system and an API 614 lubrication system             be performed at the supplier’s facilities, i.e. in
                                                                                    Termomeccanica Pompe’s case, at its La Spezia
                    and will be driven by a 3050 kW motor. An API 671               headquarters test center. The delivery of the four
                                                                                    pumps is planned for July 2015.
                    coupling will be fitted onto the skid, which will be
                                                                                    Sea water lift pumps
                    installed on a 3-point base plate with gimbal-type ball
                                                                                    The second order is for the supply of four API 610 VS1-
                    joints. An API 661 air-oil heat exchanger will also be          type vertical sea water lift pumps for the Umm Shaif
                                                                                    super-complex (figure 2). This order is actually part of
                    installed outside the skid.                                     the AGFA project (Additional Gas Supply & Flexibility
                                                                                    Assurance) wanted by the Abu Dhabi Government to
                    One of the main features of these pumps, however, is            meet Adnoc’s (Abu Dhabi National Oil Company)
                                                                                    gas need seasonal peaks, optimizing the production of
                    the back-to-back impellers solution. This configuration         the Umm Shaif complex. In this case too, the order was
                                                                                    awarded to TMP by NTC.
   TMP carried out                           combines the advantage of the          The supply consists of two vertical pumps, with 3250
  relevant team work                         balanced hydraulic thrusts derived     m3/h flow rate, 94 m head and 1160 kW and two
   involving not only                        from the back-to-back impellers with   pumps with 1320 m3/h flow rate, 68 m head and 350
 the foundry and the                         the positively reduced thicknesses of  kW.
pattern maker but also                       the castings of the BB5 barrel         The material used for the 4 pumps is super duplex
  Technip’s material                         solution in comparison to the “split   A890 gr.5A and all pumps shall be fitted with mechanical
engineering experts in                       case” solution. The aspect related to  seals with API 682 13/62 system plan and API 671
 order to optimize the                       the reduced thicknesses of the         flexible coupling.
  design of the barrel                       castings was particularly critical     The main feature of these pumps is their size: 2 pumps
and its melting process                      given that the type of pumped water    will be over 28 m long, motor included, while the other
 and reduce material                         and its pressure required the use of   2 will be 24 m long. The pumps will weigh 36,000 and
                                             super duplex stainless steel for the   19,000 kg respectively.
   thickness to the                          pressure components. In fact,          The development of the project has been characterized
       minimum                               Termomeccanica had to reconcile        by the unusual length of the pumps, which has required
                                                                                    a specific involvement of TMP’s R&D team in the design
                                             the mechanical features of the         the pump. In fact, particular attention has been given to
                                                                                    the accuracy of the modal analysis (so as to guarantee
                    pressure components, that pushed towards increasing             the absence of any vibration) and, consequently, to the
                                                                                    modelling of both the pump and the interface between
                    thicknesses, with the metallurgic difficulties of super         the pumps and the installation deck.
                                                                                    After a first complete assembly, the pumps will be
                    duplex production that grow in parallel to the increase         tested in TMP’s La Spezia test center at reduced
                                                                                    length; they will then be completely re-assembled to
                    of the material thicknesses.                                    finish the various final adjustments before being
                                                                                    dismantled and divided into vertical modules for
                    In this context, TMP carried out relevant team work             shipment.
                                                                                    Assembly on the platform will take place by inserting
                    involving not only the foundry and the pattern maker but        the various modules between the decks and by
                                                                                    lowering them one at a time into the caisson. The
                    also Technip’s material engineering experts in order to         delivery of the four pumps is planned for June 2015.

                    optimize the design of the barrel and its melting process

                    and reduce material thickness to the minimum.

Fig. 2 - Umm Shaif  As it is usual for such complex projects, the supply
site                includes a complete string test for each pump, test to

                                                                                    Process pumps

                                                                                    A third order concerns forty-eight vertical pumps for the
                                                                                    development program of the Satah Al Razboot site
                                                                                    (figure 3).The order was awarded to TMP by Hyundai
                                                                                    Engineering and Construction (HDEC) that won the
                                                                                    tender for the EPC activities for package 4 of the Satah
                                                                                    Al Razboot Full Field development.
                                                                                    The pumps shall be installed as part of a series of

               Industrial Plants - May 2015