Fig. 2 – Primeflo results

Fig. 3 – Gamma ray scan results

Level 1                                             and venting into C/WO (also known as landing
Flowline depressurization with support of           string).
landing string and Completion / WOrkover riser
equipment (C/WO). Considering 650 m water           Level 2
depth at well location, melting pressure at sea     Flowline disconnection and recovery. Gooseneck
bed would have been reached only displacing         disconnection and pulling to surface would have
landing string with gaseous phase. Intention        made possible to access flowline with coiled
was to perform cycles of nitrogen displacement      tubing, unlocking a series of intervention options

52 Impiantistica Italiana - Settembre-Ottobre 2015