Page 127 - Industrial Plants
P. 127

Oman turns to WEG to enhance gas



            recovery in major depletion project




            Achieving maximum productivity from oil and gas fields is the prime goal for the
            petrochemical industry but the extraction process becomes more difficult as fields
            become depleted.With this in mind, leading global manufacturer of motor and
            drive technology,WEG,has developed bespoke variable speed drive systems to
            help with extraction from some of Oman’s older oil fields where the natural
            pressure is beginning to fade











                        oosting extraction from depleting
                        reserves  is  part  of  a  US$33  billion
                        project  which aims to enhance
                        Oman’s hydrocarbon production
                        capabilities and help the country
            Bbroaden its economic base.It is
            expected that Oman will unlock about one trillion cubic
            metres  of  natural  gas  over  the  next  25  years,
            representing a long term sustainable competitive
            feedstock for its petrochemical industry. Plans are also
            afoot to develop downstream industries such as the
            production of Ethylene Dichloride (EDC), Caustic Soda
            and other chemicals.
             
            As part of this major effort, the PDO SaihRawl Field
            Depletion Project, Phase 2, will see US$550 million
            invested on developing a daily gas production capacity
            of 30 million cubic metres, which will be fed to the   compressorwith an efficient drive system, which could
            existing SaihRawl central processing facility. Extra   endure the most demanding applications.
            compressors will be installed to increase the pressure    
            so that gas continues to flow, enabling the field to feed   To meet such needs, WEG has developed a bespoke
            the liquefied natural gas (LNG) industry while offering a   solution comprising48 30kW variable speed drives and
            back-up  when other  plants  are  shut  down  for   motors and 32 15kW drives and motors,which have
            maintenance.                             been  supplied  as  systems  and  mounted  in  control
                                                     cabinets, and also includea high capacity circuit breaker
            Electric motors willplay a key role in ensuring that such   for emergency cut outs and a by-pass system for DOL
            compressors  runefficiently,  smoothly  and  reliably,  as   (direct on line) starting. Additionally, WEG has fitted its
            they  will be responsible for  driving  their  suction  and   equipment with a passive input harmonic filter to
            discharge  cooler  fans.  Bearing  in  mind  that  electric   reduce problems relating to mains borne corruption of
            motor-driven systems (EMDS) are the largest individual   the power supply, while an output filter will be used to
            source of energy use, accounting for 45% of the   protect the drive.
            world’s electricity consumption, and over half of this    
            energy demand originates from motors used in fans   WEG’svariable speed drive systems have been tested
                         1
            and compressors, Indian company Larsen & Toubro   at its manufacturing facility in Brazil in the presence of
            decided to partner with WEGto equip the main gas   inspectors from PDO and Larsen & Toubro to simulate


                                                                                    IndustrIal Plants - May 2017
                                                                                                                  125
   122   123   124   125   126   127   128   129   130   131   132