Page 53 - Industrial plants
P. 53

shows, at least for now, this is a mind that has space
            only in the ideal world.

                 “The plant has the function of
               disposing, through the waste-to-
              energy process, of the fraction with
               fuel value contained in municipal
              waste and similar to non-hazardous
                urban waste downstream of the
                      separate collection


            Therefore,  waste-to-energy  is  the  combination  of
            various processes aimed at achieving this following
            goals:
            •   Optimal waste combustion;
            •   Production  of  electrical energy with  high
                thermodynamic efficiency;
            •   Minimize emissions in the environment.
                                                      “The plant, installed in Sardinia, has   Fuctional sectors
            The main processes which interact are:    a nominal capacity of about 61000
            •   Preservation of the heat load and waste   t/year of waste with an average
                combustion;                              calorific heat of 13188 KJ/kg
            •   Temperature at the end of the post-combustion
                chamber (T );                        agricultural areas and deciduous forests. The plant
                        2s
            •   Heat recovery by producing superheated steam;  elevation is above 410 m and nearby stands the cleaner
            •   Absorption of sour gas contained in the flue   where rain waters and the processed ones are
                gases;                               discharged.
            •   Denitrification of the flue gases.   The revamping project of the Macomer plant, costed
                                                     over 50 million euro, includes the construction of a
            The Tossilo waste-to-energy plant is located to the   grate combustion line above 30MWt. The design
            south of Macomer, in an industrial zone and a in large   criterion adopted, has been the one with maximum
            area characterized by an alternation of non-irrigated   conservation of the existing plant, during the period of


































                                                                                               Macomer waste to
                                                                                               energy plant (A.
                                                                                               Ruggiero’s photo)


                                                                                    IndustrIal Plants - May 2023
                                                                                                                   51
   48   49   50   51   52   53   54   55   56   57   58