Page 54 - Industrial plants
P. 54

the construction of the new plant in order to not   POWER AND PERFORMANCES
                             interrupt the service. The new line is structured in the   Input power to the generator  7,91 MW
                             following functional sectors, as represented in the   Power at the generator clamps  7,09 MW
                             figure.
                                                                        Plant self-consumption utilities  1,006 MW
                                                                        Electrical energy net production  6,084 MW
                             Monsud S.p.A., a construction company operating in
                             the civil and industrial engineering based in Avellino,   Input thermal energy  27,97 MW
                             has been engaged itself in the development of the   Boiler efficiency  83,87 %
                             executive project, which represents the third and last   Combustion efficiency  81,56 %
                             phase of the design, predicting the engineering of all   Gross return of the plant  25,35 %
                             works and fully defining the actions to be taken.  The   Net return of the plant  21,75 %
                             company, founded in 1979 by engineer D. Pierni, is an
                                          expert in metal carpentry and     Table 1: Power and efficiency at CTN point
                   “Particular care has   energy systems.
                  been taken to prevent   The implementation of the project   dispose of, through the waste-to-energy process, the
                    the release of dust,   has been structured in six phases:   fraction with combustible valence contained in urban
                     the maximization     the first one has involved the   waste and comparable to the non-dangerous urban
                     of efficiency and    wrecking of some existing buildings,   ones downstream the collection differentiated waste.
                     the recovery and     the planting of the yard and all the   The process is designed to operate 333 days/year
                   treatment of process   related works; during the second   (8000 h/years), with 91% of use rate, to incinerate a
                     and storm water      phase, excavation has been realized   quantity of combust waste equal to 61120 Ton/year,
                                          to carry the plans to the right   with an average PCI equal to 12180 kJ/kg. The
                             elevation; in the third phase, superficial and deep   combustion line is also capable of operating with
                             foundation works has been done; the fourth phase has   different thermal power waste. In the project phase, an
                             been characterized by the use of reinforced concrete   horizontal boiler solution has been preferred because
                             for vertical constructions and the start in building the   of the higher efficiency of pipe cleaning. The mechanical
                             main buildings in metal carpentry; the fifth phase has   percussion cleaning system, compared to the classical
                             been dedicated to complete   Oxygen level in combustion gases at the outputof the post- 6..8 % (in vol.)
                             the previous phase and, at the   combustion chamber
                             same time, to install the plants   Time spent downstream of the last air injection  >2 / 850 sec/°C
                             and the electromechanical   Input air temperature first             140 °C
                             equipment; the sixth and last
                             last  phase,  has  been  Input air temperature second               24 °C
                             destinated to the external   Waste-heat load                        27,9 MW
                                                                                                        3
                             arrangements and fixtures. For   Flue gas flow rate                 68644 Nm /h
                             the   plants  realization,  Superheated steam pressure (out of the boiler)  50 bar.a
                             numerous excavations has   Superheated steam temperature (out of the boiler)  410 °C
                             been  performed,  for  a  total   Steam production                  32,305 t/h
                             amount of 5640 m3. The most   Combustion gas temperature (out of the boiler)  195 °C
                             relevant ones are referred to a   Residue
                             bunker in the waste hole, at   Waste + non-combustible from grate bottom (dry)  0,912 t/h
                             the furnace-boiler building and
                             the one hosting the thermal   Boiler fly ash                        0,0446 t/h
                             cycle.                  Particles from ELF                          0,101 t/h
                                                     Average daily concentration of flue gas pollutants at the chimney
                             The new line is sized to allow                                  NO X  30 mg/Nm 3
                             energetical  performances                                       PTS 0,75 mg/Nm 3
                             reported in the following table.                                SO 2  5 mg/Nm 3
                             1.                                                               HCI 3 mg/Nm 3
                                                                                              HF 0,4 mg/Nm 3
                             Other main functional features                                  NH  4 mg/Nm 3
                                                                                               3
                             of the plant at the CTN are                                      CO 15 mg/Nm 3
                             reported in the table 2.
                                                                                             COT 3,5 mg/Nm 3
                             The function of the plant is to           Table 2: Operating characteristcs at the CTN point



            IndustrIal Plants - May 2023
    52