Page 16 - Industrial Plants
P. 16

Figure 2 - 3D Model
          for pipeline string
          preparation works
                             HDD Preparation Works Design              (the longest of about 1,100 metres) from the Southern

                                                                       side.  This was primarily driven by the limitation of
                             The selected HDD profile had a total length of 1,842   earthworks and environmental impact and supported
                             metres, with a horizontal distance of 1,794.4 metres.   by the low risk of bore collapsing, as it required two
                             The feasibility of the HDD was confirmed in August   tie-in welds during the pullback.
                             2021 when a 1,622 metres exploration borehole had   The selected pullback ROW was challenging, featuring
                             been successfully drilled along the actual pilot hole   hilly and rocky terrain with horizontal and vertical
                             alignment from the South pad to about 200 metres   deviations, a 17 degree slope 220 metres long, the
                             from the North Pad exit point.            crossing of two watercourses and one road. The
                             The exploration borehole confirmed a low risk of frack   overbreak section, spanning 280 metres with a
                             out and bore hole collapse within the rock strata,   maximum height of 15 metres to allow the pipeline
                             increasing to moderate risk in the surficial layers (up to   string to pass through the contingency thruster and
                             10-14 metres depth from the drilling surface at both   meet the 11 degree entry angle, was supported by
                             North and South pads).  To manage this risk, installation   seven cranes (six 120 tons cranes and one 160 tons
                             of 60 metres – 70 metres casing pipe was the selected   crane) as well as four side booms.  The remaining 820
                             mitigation measure.                       metres of the drag section had been placed on 100
                             Particular attention was given to the design of the   roller supports designed for the pullback and hydrotest
                             pullback section and the fabrication of the pipeline   loads (40 tons).
                             string,  as  the  area  surrounding  Dry  Gulch  featured   To ensure a successful pullback,  a comprehensive
                             uneven terrain, steep slopes, several creeks, and a   study for the string preparation was performed,
                             winding right-of-way, due to environmental constraints.  including an integrated 3D Model/Finite Element
                                                                       Analysis (FEM) Analysis.
                                “Particular attention was given to
                               the design of the pullback section      Additionally, a FEM analysis was conducted to analyze
                               and the fabrication of the pipeline     both the static and dynamic behaviour of the pipe
                               string, as the area surrounding Dry     string during the pullback phase. In particular, FEM
                              Gulch featured uneven terrain, steep     simulation produced the following results:
                              slopes, several creeks, and a winding    •   Verification that the maximum stress induced in
                               right-of-way, due to environmental         the string during lifting and pulling operations was
                                           constraints                    within acceptable limits, guaranteeing the integrity
                                                                          of the pipe string;
                             By the end of 2021, a detailed pullback study analysed   •   Definition of the distribution of the equipment and
                             several options, including single or multiple strings from   the vertical and lateral loads required for
                             both the Northern and Southern sides of the gulch. The   equipment sizing and design additional anchoring
                             final selected option was to pull three pipeline strings   systems;