creates a harmonized mind-set between             Finally yet importantly, once the methodology has
      Company and Contractor.                           been executed within the frame of project activities,
•	 Development of a flow diagram intended to            it could also be fine-tuned inside Company’s
      guide Company through a 360 degree iterative      organisation to further align stakeholders’
      evaluation of the Project’s and of contracting    expectations, consolidate the contracting strategy
      strategies alternatives’ Opportunities,           for future project development, and consistently
      Strengths, Weaknesses and Threats.                prepare next steps.
•	 Explanation and analysis of the contracting
      alternatives (in terms of split in packages,      References
      SoW, compensation schemes and taking over
      and acceptance schemes) that are relevant to,     [1] United Nations Uncitral: Legal Guide on Drawing
      and feasible for, the Company’s project.          Up International Contracts for the Construction of
•	 Development of                                       Industrial Works - UN NY, 1998
     -	 a methodology for ranking said                  [2] Project Management Institute: Project
                                                        Management Body of Knowledge – PMBOK Guide
           alternatives, describing the proposed        Fifth Edition 2013
           scoring method                               [3] United Nations: Uncitral: Legislative Guide on
     -	 the matrices (and the parameters/               Privately Financed Infrastructure Projects - UN NY,
           criteria therein), together with a detailed  2001
           description of said parameters and the       [4] Simon H. (1916-2001): Models of Bounded
           consequent assigned weights.                 Rationality and Other Topics in Economics, 1982
•	 Joint meetings with Company’s for complete
      gathering of information.
•	 Summary analysis and concluding report.

Olimpia Loiacono

Olimpia is a Project Manager in Technip Italy.          refining and petrochemical industrial complexes.
She has over 20 year experience in the oil &            Before joining Technip Italy, she worked in KTI SpA,
gas industry mainly involved in engineering and         where she held the position of Manager of Process
construction projects. Her most recent work             and R&D Departments.
experiences are in the management of Front              She holds a Degree Cum Laude in Chemical
End Engineering Design projects for large scale         Engineering.

Jorge A. Corredor Botero

Jorge A. Corredor Botero holds a BS. Cum Laude,         Currently, he is a Contract and Risk Manager for
in Electrical Engineering from the University of Los    Technip, based in Italy, and his work regards the
Andes, Colombia, and a MS in Finance (Financial         management of all contracts and commercial
Engineering) from HEC Lausanne, the Faculty             aspects of the project (including the identification
of Business and Economics of the University of          of project risks and implementation of the relevant
Lausanne.                                               mitigation actions), in liaison with the Project
After a short experience with Occidental Petroleum      Director.
Corporation, he joined the Technip Group in 2006.