2009, banning geological storage oof nCly.OI2n, big step forward is expected as soon as these
while two allowed off-shore storage projects will reach the operational phase.
some countries permission procedure would Research of novel capture technologies
could not achieve the expected cost
be so complicated to discourage potential reduction
applicants.
CCS today Figure 1 shows projects in the design, construction
Progress has been slow but constant in other and operation phases split by geographical area.
North-America has clearly taken the lead in the
areas of the world where several projects have deployment of CCS, while Continental Europe
is left with the two “historical” operating storage
in the meantime reached the execution phase. projects in Norway, while no projects are currently
in the construction phase.
As of February 2015, 55 large (at least 0,5
Mton/year of CthOe2 stored) CCS projects are
active all over world in different phases of
development. Of these, 13 are in operation
and 9 in the construction phase. Most projects
ipnurtihfiecaotipoenraotifonnaptuhraaslegsatso.reSeCvOe2racl opmroinjegctfsromin North America
the construction or advanced design phases Several causes concur to make North America
however include carbon capture from power an ideal environment for application of CCS.
stations or other industrial sources, so that a
Captured C(EOO2Rm), afyavboerabulsyedcofnotrribEunthinagncteod Oil
Recovery the
economics of the project, while in Europe only pure
geological storage is possible, with no revenues
involved. North America has also established
specific R&D and demonstration programs for
CCS, while in the struggle for European funds,
CCS is competing versus renewable energy. This
is a losing game for CCS due to the unbalance of
relative costs. A single CCS demonstration may
have an overall cost in the ballpark of 1 billion of
Euros. With the same amount of money, several
renewable demonstrations have been funded.
Finally, no problems related to public acceptance
of geological storage tohfeCwOo2rlhda. ve been faced up
to now in this area of
Fig. 1 – Number of CCS plants by geographical area
Decoupling capture and storage in the
Kemper County IGCC Project
Location: Kemper County, Mississippi, USA
Owner: Mississippi Power (Southern Company)
Schedule: start-up expected May 2015
Cost: ~5.5 billion US$ vs. initial estimate of 2.4 billion (DOE
funding for 270 M$)
Description: new built 582 MW coal-based electric power plant
using an Integrated
Gasification Combined Cycle (IGCC) design called
TRIG™ technology (developed in-house)
Capture: 3.5 Mtons/year (65% of total emissions)
Transportation: 100 km onshore pipeline
Storage: enhanced oil recovery