Fig. 1 – Load diagram of the
Mechanical Running Test

                              •	 gearbox mechanical run;                             20% of the vibration value, the Client and

                              •	 seal system test;                                   the Manufacturer shall meet and agree a way

                              •	 auxialiaires functionality tests (lube oil etc.).   forward for the test completion;

                                                                                     •	 the measurement of synchronous vibration

                              The final tests are:                                   amplitude shall be done before and after the

                              •	 Mechanical Running Test;                            test. These measurements shall consider the

                              •	 Performance Tests (single compressors);             vibration both filtered (one every revolution)

                              •	 Complete unit test, with performance curves         and non-filtered. The velocity range shall cover

                              in full load (Type 1) or similarity (Type 2);          from zero to trip value of the gas turbine;

                              •	 turbine heat rate;                                  •	 mechanical test shall verify the lateral critical

                              •	 emissions (NOx and CO with methane                  speed.

                              combustion).

                              The tests are performed in accordance with the             Usually the mechanical run test is
                              following standards:                                   performed at maximum continuous speed:
                              •	 Performance Test: ASME PTC 10, 1, 2                 100% for electric driven trains, 115% for
                                                                                      gas turbine driven trains. In accordance
                                    (compressors), 22 (gas turbines);                with API 617, the test duration shall be at
                              •	 measurement ISO 5167;
                              •	 Mechanical Running Test API 617                                  least four hours.

                                    (compressors), 616 (gas turbines).

                              1.1 Mechanical Running Test                            After the Mechanical Running Test is finished, a
                                                                                     visual inspection of the bearings is performed,
                              This type of test is done only at the Manufacturer’s   to ascertain their integrity and the lack of surface
                              factory. The single compressors are placed on the      defects. The test is deemed not acceptable if
                              test bench and driven by a launch motor with speed     replacement or repair of the bearings and seals
                              increase from zero to 100% maximum continuous          or other components is required. Therefore, it is
                              speed. A certain time is allowed to get the shaft      a no-load running test: the purpose of this test is
                              bearings stabilized, the lube oil temperature and      to demonstrate the mechanical functionality of the
                              the shaft vibration level (figure 1).                  rotating parts (shaft, bearings, and measurement of
                              Usually the mechanical run test is performed at        the vibration levels).
                              maximum continuous speed: 100% for electric
                              driven trains, 115% for gas turbine driven trains. In  1.2 Performance Test
                              accordance with API 617, the test duration shall be
                              at least four hours.                                   The single compressors are placed on the test bed
                              During the test, the vibrations of the compressor      and driven by a launch motor. Test gas is used for
                              bearings are measured and recorded at different        the compressor feed; it is a mixture prepared for
                              speeds.                                                the purpose. At least 4 operating points shall be
                              Also the overspeed test is carried out with the        recorded, such as:
                              purpose to check the behaviour of the compressor       •	 close to surge;
                              in off-design condition. During the Mechanical         •	 compressor overload (105% overspeed);
                              Running Test the following requirements shall be       •	 guarantee point (design point);
                              met:                                                   •	 max flow.
                              •	 with the equipment at full speed the amplitude
                                                                                     The compressor characteristic curve is acquired
                                    and frequencies of the vibrations are monitored  and plotted during the test.
                                    with steps from 0.25 to 8 times the maximum
                                    continuous speed within the limit of 90.000
                                    cycles per minute (1500 Hz); if the amplitude
                                    of each non-synchronous vibration exceed

40 Impiantistica Italiana - Luglio-Agosto 2015
   37   38   39   40   41   42   43   44   45   46   47