Page 25 - 62
P. 25

The test power plant is a full scale simple cycle power   42.3% efficiency. In a combined cycle, this corresponds
            station that can be used for the operation and validation   to performance about  520 MW at 62.3% net efficiency
            of the fully instrumented engine under real power plant   in  ISO  conditions.  The  scaled  up  50  Hz  version,  the
            conditions, because the power is dispatched to the   GT36-S5, achieves 760 MW at 62.6% efficiency.
            Swiss power grid.
            The test program included stress testing of the two
            stages in the sequential combustion system, part and  The family, what a team
            full load mapping, transient operation and performance   On November 2, 2015, Ansaldo Energia announced the
            testing. The validation engine is equipped with more   closing of its acquisition from General Electric of
            than 3,000 measurement points, includinga telemetry   Alstom’s advanced heavy-duty gas turbine business
            system which transfers more than 500 measurements   and its subsidiary company Power System
            from the rotating parts. In the end, the tests fully   Manufacturing. It represented a turning point in a
            confirmed our expectations.              lengthy process, with commercial and political
            High performance and low emissions over the entire   implications. The deal  between General Electric  and
            load range confirm all the objectives of the development   Ansaldo Energia included the latest ratings of the GT26
            program and the wide operation window of this engine.  and GT36 heavy duty gas turbines, but most importantly,
            The GT36’s combustion system had already been   more than 400 Alstom R&D Center employees in
            tested, starting in 2013, as a single component in a   Baden, Switzerland.
            combustor test rig, at full size and under full mass   And so, the family grew in size, gaining new talents and
            flow, at the DLR (the German Aerospace Center) in   new professional skills, and with them a set of
            Cologne.                                 commitments and prospects allowing the company to
            The test results reported for the GT36-S6 (the 60 Hz   look ahead with great optimism and even more
            version) confirmed power output above 369 MW at   confidence to the challenges of the future.
























































                                                                                    IndustrIal Plants - May 2018
                                                                                                                   21
   20   21   22   23   24   25   26   27   28   29   30