Page 26 - 62
P. 26

The operation offered Ansaldo Energia the opportunity   finalize the production of the turbines near the loading
                             to start producing the new generation of H-class   platform, ready to set off on their adventurous journey
                             turbines  immediately,  optimizing  design  and   into the future, because transportation from the factory
                             development time.                        by road is impossible.
                             Ansaldo Energia  took over  intellectual property rights   The individual components manufactured and
                             for the GT26 and GT36, existing upgrades and pipeline   preassembled in the Genoa-Campi factory are
                             technology for future upgrades, and with service   transferred to the new facility, which covers a total
                             agreements for 34 GT26 turbines already installed.  surface area of 10 thousand square meters, where the
                             Together with its sister GT26, the GT36 joins its new   production cycle is completed with the final assembly
                             Ansaldo Energia GT family.               of the new GT36 turbines.
                             The family grows significantly, now including top   To make all this possible, the welding area has been
                             products at upper end of F-class and new H-class.  extended, with the installation of equipment that can
                             Together with its well-known and family members   weld rotors up to 200 tonnes in weight and 14 meters
                             AE64.3A (small F-class), AE94.2 (E-class) and AE94.3A   in length.
                             (F-class) Ansaldo has a full-fledge portfolio (in 50 Hz)   There is no doubt that this new facility represents a
                             and different models specialized for different market   point of arrival in a production process of vital strategic
                             segments:                                importance, but it is also, and more importantly, an
                             • more and better fit to special market requirements;  launchpad that puts Ansaldo Energia in the ideal
                             • from small to very large size;         position to tackle the challenges it faces on international
                             • from best fit for open cycle to combined cycle;  markets in the future.
                             • from cost-optimized to performance-optimized.  In February 2018, finally, the first GT36-S5 model gas
                                                                      turbine produced at Ansaldo Energia’s Genoa
                                                                      production facility was presented at the presence of the
                             The new production site                  most important national and local authorities.
                             on the sea                               The GT36 is the most powerful engine built by Ansaldo
                                                                      Energia today. Nicknamed “Mont Blanc”, because it is
                             Ansaldo Energia prepared a warm welcome for its new   the top machine in Europe by power, the turbine
                             family members GT36 (and also GT26): it invested over   generates 538 MW of power (ISO conditions) in the 50
                             65 million euros to create the conditions to bring the   Hz version presented today and 760 MW in a combined
                             production of machines based on former Alstom   cycle with an efficiency of 62.6%.
                             technology to Italy, involving adaptation work on the   The GT36 has been developed to deliver high efficiency
                             existing facilities and the construction of the new   combined with great operating flexibility, allowing it to
                             industrial shed in Cornigliano (Genoa), which was   deliver power according to the changing needs of the
                             officially  opened  in  June  2017.  The  Cornigliano  site   grid,  compensating  for  and  supporting  intermittent
                             provides a new accommodation directly on the sea   electricity generation from renewable sources. With the
                             shore. From the new site, which has direct access to   ongoing support of Ansaldo Energia’s Chinese partner,
                             the sea and a dedicated dock, the new generation   Shanghai Electric Group, the first GT36 maxi gas
                             GT36 turbines will set sail to international markets.  turbines will be installed in two power generation plants
                             It is an important investment that satisfies the need to   in the Shanghai area.









                                                                                                                                Power Together








                                                                                                                                 Manufacturing and technological capabilities,
                                                                                                                                 design expertise,
                                                                                                                                 innovative spirit and ability to deliver results,
                                                                                                                                 to offer tailor made solutions based on Customers’ needs.
                                                                                                                                                                                                                  ansaldoenergia.com


            INDUSTRIAL PLANTS - May 2018
    22



                                                                                                                          AW_ANSALDO_adv_28_2_18.indd   1                                                                             27/03/18   14:38
   21   22   23   24   25   26   27   28   29   30   31