fter an important audit and through   Certificates) certified control panels whose software
                         an international and competitive   and hardware is property of SANCO.
                         tender SANCO SpA has been
                         assigned a 7 million euro project for
                         the protection of an ethylene cracker  High pressure CO  systems
            A unit in Siberia (Russia) by one of the   skid-mounted    2
            largest German EPC. The supply has consisted of three
            main items:                              Four buildings have been protected with CO  self-
                                                                                       2
            •   fire detection systems;              standing rack-mounted systems equipped with self-
            •   high-pressure CO  systems skid-mounted (for   checking weighing devices. A piping distribution system
                             2
                indoor installation);                and stainless steel fittings were individually tested at
            •   groups of deluge valve skids in container (for   more than 200 bar. 1116 cylinders were also included
                outdoor installation).               in the systems which obviously comply with the
                                                     aforementioned GOST / EAC regulations.
            Not an easy task since requirements on tender
            documents were very stringent and, particularly, it was
            important to take account of severe weather conditions
            such as a temperature of -47 °C during the coldest day
            with 98% coverage and an absolute minimum of -52
            °C. Moreover, the design and manufacturing of systems
            were due to comply with following regulations,
            standards and Russian laws:
            •   NFPA regulations which apply to every single item
                in the contract. NFPA15: Standard for Water
                Spray Fixed Systems for Fire Protection;
            •   Federal Law No.123 FZ Technical Regulations on
                Fire Safety Requirements;
            •   SP 5.13130.2009 Fire Protection Systems,
                Automatic Fire Alarm and Fire Suppression
                Systems;
            •   SP 6.13130.2009 Code of Practice, Fire Protection
                Systems,  Electrical  Equipment,  Fire  Safety
                Requirements;
            •   NPB 88-2001 Fire Extinguishing and Fire Alarm
                Installations, Design Norms and Rules;
            •   GOST R 50680-94 Automatic Water Fire
                Extinguishing Systems, General Technical  Deluge systems                       Deluge valves special
                Requirements, Test Methods;          These systems were made up of a series of manifolds   containers in factory
            •   GOST R 12.3.047-2012 Fire Safety of   on which more than 100 deluge valves are installed and
                technological Processes;             they were located in special containers. These prefab
            •   GOST R 51043-2002 Automatic water and foam   units (some  of  which  longer  than  14  m  and  with  an
                fire fighting systems. Sprinkler, spray nozzles and   average weight of more than 23 tons) were built strictly
                water mist nozzles – General Technical   in accordance with customer’s specifications as follow:
                requirement.                         •   compact  systems  suitable  for road and  rail
                                                         transport;
            Thus, preliminary studies and manufacturing of systems   •   suitability for the use at very low temperature and
            were  carried  out  by  taking  into  consideration  EAC   proper thermal insulation. In this regard, one of the
            certified  equipment  and  instrumentation  intended  for   requirements was: for winterization two electrical
            very low temperatures, with particular regard to   heaters,  a  thermostat,  cable  connected  in  a
            temperature-resistant steels.                junction box shall be installed to maintain the
            In depth, the supply has comprised the following three   temperature (also during the transportation) of the
            items.                                       heated enclosure above 5 °C. Heaters to be
                                                         equipped with alarming function for failure
                                                         detection;
            Fire fighting detection systems          •   weather-resistance, especially to roof snow load
                                                                2
            The system includes 4 GOST-R and EAC (EurAsian   (240 kg/m );