OPPORTUNITY
to project requirement:
• four (4) Wellhead Platform (WHP) Topsides
(Jackets by others);
• six (6) Riser Platforms (RP), including Topsides
and Jackets;
• six (6) Bridges (BR) connection RPs to existing
WHPs;
• six (6) Corrosion Resistant Alloy (CRA)-Clad
Carbon Steel (CS) Intra-fi eld Pipelines;
• one (1) pipeline Decommissioning;
• four (4) Subsea Composite (Power and Fiber
Optic (FO)) Cables;
• signifi cant Offshore brownfi eld modifi cations
and upgrade at existing Offshore facilities;
• equipment upgrade at North Field Bravo (NFB)
complex to accommodate revised fl ow con-
ditions;
• 1x ~98km, 32” CS dry, sour gas export pi-
peline, PL1L, beach valve and pig receiving
facilities, and tie-in to the existing QGS slug
catcher-1 located in RLIC and associated
onshore brownfi eld modifi cation;
• 1x ~103km, 38” CS wet, sour gas export pi-
peline, PL610L, beach valve and pig receiving
facilities, and tie-in to the existing QGS slug
catcher-3 located in RLIC and associated
onshore brownfi eld modifi cation;
• 1x ~81km, 32” CS dry, sour gas export pi-
peline, PL1N, beach valve and pig receiving
facilities, and tie-in to the existing QGN slug
catcher-1 located in RLIC and associated
onshore brownfi eld modifi cation.
The project scope of work includes Engineering,
Procurement, Fabrication, construction, Installa- The Project Management Team (Engineering, Pro-
tion, Hook-up and System Completion for the fol- curement, Operation and Operation) will be located
lowing facilities. Additionally, provide startup assi- in Doha Qatar.
stance for the facilities if requested in accordance The Detailed Engineering will be executed partially
18 18 Impiantistica Italiana - Luglio-Agosto 2021