OPPORTUNITY






                                                                      to project requirement:
                                                                      •   four  (4)  Wellhead  Platform  (WHP)  Topsides
                                                                         (Jackets by others);
                                                                      •   six (6) Riser Platforms (RP), including Topsides
                                                                         and Jackets;
                                                                      •   six (6) Bridges (BR) connection RPs to existing
                                                                         WHPs;
                                                                      •   six (6) Corrosion Resistant Alloy (CRA)-Clad
                                                                         Carbon Steel (CS) Intra-fi eld Pipelines;
                                                                      •   one (1) pipeline Decommissioning;
                                                                      •   four (4) Subsea Composite (Power and Fiber
                                                                         Optic (FO)) Cables;
                                                                      •   signifi cant  Offshore  brownfi eld  modifi cations
                                                                         and upgrade at existing Offshore facilities;
                                                                      •   equipment upgrade at North Field Bravo (NFB)
                                                                         complex  to  accommodate  revised fl ow con-
                                                                         ditions;
                                                                      •   1x ~98km, 32” CS dry, sour gas export pi-
                                                                         peline, PL1L, beach valve and pig receiving
                                                                         facilities, and tie-in to the existing QGS slug
                                                                         catcher-1 located in RLIC and associated
                                                                         onshore brownfi eld modifi cation;
                                                                      •   1x ~103km, 38” CS wet, sour gas export pi-
                                                                         peline, PL610L, beach valve and pig receiving
                                                                         facilities, and tie-in to the existing QGS slug
                                                                         catcher-3 located in RLIC and associated
                                                                         onshore brownfi eld modifi cation;
                                                                      •   1x ~81km, 32” CS dry, sour gas export pi-
                                                                         peline, PL1N, beach valve and pig receiving
                                                                         facilities, and tie-in to the existing QGN slug
                                                                         catcher-1 located in RLIC and associated
                                                                         onshore brownfi eld modifi cation.
                            The project scope of work includes Engineering,
                            Procurement, Fabrication, construction, Installa-  The Project Management Team (Engineering, Pro-
                            tion, Hook-up and System Completion for the fol-  curement, Operation and Operation) will be located
                            lowing facilities. Additionally, provide startup assi-  in Doha Qatar.
                            stance for the facilities if requested in accordance   The Detailed Engineering will be executed partially