3D simulation of the horizontal high pressure boiler feed water pump   FEM analysis of pump and baseplate for optimization of skid
                                                                      dynamic behaviour within full design speed range

























            FEM analysis on pump casings and tie bolts for maximizing   3D simulation of the customized pump skid
            reliability of design to the worst operating conditions in terms of
            temperatures & pressures.


            The FEM analysis of pump and baseplate allo-  The entire supply was validated
            wed to optimize the dynamic behaviour of the skid   with high temperature testing, a
            within the full design speed range. FEM analysis
            also contributed to designing casings and tie bolts   “test not many pump
            for the worst operating conditions in terms of tem-  manufacturers are equipped to
            peratures & pressures.                        perform
            Impellers, diffusers & casings were developed
            through of CFD analysis and prototype testing in
            TMP’s in-house test centre:               mechanical variable speed coupling allows speed
            •   The fi rst stage impeller was optimized for low   variation from 25% to 100% of the nominal speed
                NPSHr (for both single and double suction de-  with a high level of reliability thanks TMP’s decen-
                sign)                                 nial experience in similar power plant application.
            •   The other stages were optimized for high ef-  The pump mechanical seals were coupled with
                fi ciency.                             an API PLAN 23 System, which consists of a clo-
                                                      sed loop system with a pumping ring performing
                 The pump skid was developed          product circulation through a heat exchanger and
                 with highly customized auxiliary     back to the seal chamber.
            “equipment in order                       The entire supply was validated with high tempe-

                 to tailor to the specific plant/      rature testing, a type of test not many pump ma-
                                                      nufacturers are equipped to perform. The scope of
                 client requirements                  such test is to verify the correct mechanical opera-
                                                      tion of the pumps and their conformity to contrac-
            The pump skid was also developed with highly cu-  tual requirements.
            stomized auxiliary equipment so as to tailor to the
            specifi c plant/client requirements. In particular, the   After testing, the pump skids were prepared for



                                                                                   Impiantistica Italiana - Maggio-Giugno 2022  49 49