Page 34 - 101
P. 34

DIGITAL SUITE




                            dataset to measure project status and performan-  The Project Control Tower is
                            ces.                                          today a valid support for project
                            The backbones of the Maire Tecnimont control to-“governance and offers internal
                            wer are:                                      stakeholders and our customers
                            •   Engineering activities status
                            •   Document management status                a large and in-depth data set
                            •   End-to-end material management            to measure project status and
                            •   Construction activities Workfront         performance
                            •   Quality & HSE (Health Safety and Environment)
                            •   Environment, Health, and Safety Management
                            The Engineering activities status is monitored   supports efficient management of the Construc-
                            through Power BI Document control. It provi-  tion RFI and field inspection activities performed
                            des projects with the document status as well as   directly on the mobile application to speed up the
                            the trace of the documents issued discipline-wise.   process through automatic updates and digital site
                            It levers on the new Group Electronic Deliverable   dossier copies. Implementing the QC App creates
                            Management System (EDMS).                 a value that has a direct connection with going gre-
                                                                      ener for a Project, eliminating waste due to excess
                            The document management status is moni-   records, and registers in hard paper copies, and
                            tored through the document management re-  reducing the direct volume of efforts means less
                            porting tool. It reflects the project deliverables sta-  consumption at the construction site. The use of
                            tus as per the EDMS & Deliverable List platform. It   the QC App surely leads to improved process effi-
                            supports projects in monitoring the following main   ciency by up to 40%, reduced time for certifications
                            aspects:                                  by up to 30%, quicker hand-over to the client, an
                            •   Total expected documents as per Deliverable   RFI logbook automatically updated, a direct update
                                List and/versus actual status         on reporting systems with no manual inputs and a
                            •   Status per document class and reason for the   paperless digital process. The Punch List manage-
                                issue (Issued for Design, Issued for Construc-  ment is monitored through the Punch list App. This
                                tion, etc.)                           allows the punch list identification, classification,
                            •   Status per engineering discipline     closing, and handover through a tracked end-to-
                            •   Status per Vendor/Material  Requisition/Pur-  end process remotely accessed busing handheld
                                chase order                           devices. A change of construction management
                            •   Document Issue curves and estimation of en-  paradigm introduced and integrated with 3D Feasi-
                                gineering Workfront and List of overdue docu-  bility, later fostered with AWP becomes a distinctive
                                ments and list of open comments       plus in our industry and leads to enhanced process
                                                                      efficiency by reducing time for supervision and ma-
                            The End-to-End Material Management sta-   jor traceability.
                            tus is monitored through the Material Control
                            Tower, a digital solution for end-to-end advanced   The Environment, Health, and Safety Manage-
                            supply monitoring for data-driven decision-making.   ment are monitored through the EHSM Plat-
                            Having advanced real-time reporting on the status   form. An advanced digital tool that supports the
                            of project materials from the Material Requisition   efficient management of HSE activities. The appli-
                            (MR) issue to the Purchase Order issue and ship-  cation allows the recording and monitoring of all
                            ping compared to the Project Schedule, enables   HSE events with effective and easy control of the
                            the project to better control possible delays throu-  corrective actions and further follow-up.
                            gh data-driven analysis and scenario-based alter-
                            native simulations.
                            Construction activities Workfront is monitored  Takeaways

                            through Feasibility App and AWP Visualizer. The   The project control tower is pivotal for effective
                            Feasibility App displays directly on the 3D viewer   project management because:
                            disciplinary and multidisciplinary feasibility analysis   •   Guarantees visibility and control along the en-
                            results. The Feasibility App gives the Project and   tire EPC processes
                            Site management team a vision of where to focus   •   Enhance efficiency and efficacy in the de-
                            to achieve the goal of completion. Alarms can be   cision-making process by correlating data
                            easily raised to subcontractors for areas lacking   across different tools providing actionable in-
                            progress and proactive actions can be requested   sights in both tender and execution phases
                            from all project stakeholders.            To guarantee a control tower’s success it is essen-
                                                                      tial to have:
                            The Quality & HSE (Health Safety and Envi-  •   A clear end-to-end digital vision
                            ronment)  aspects  are monitored through  QC   •   Cleansed data
                            App, Punch List App & HSSE Platform. The In-  •   Sponsors in the organization who both spread
                            spection App for Construction Quality Control is an   knowledge of the solution and act as a refe-
                            advanced digital tool integrated with MileMate! that   rence point in the adoption phase.


       30  Impiantistica Italiana - Gennaio-Febbraio 2023
   29   30   31   32   33   34   35   36   37   38   39