Page 32 - 101
P. 32

DIGITAL SUITE




       The Maire Tecnimont’s Project



       Control Tower,



       for excellence of EPC execution












                            The Evolution of EPC project              •   Quality assurance and control as well as He-
                            management for the practices to              alth, Safety & Environment aspects
                            enhance maintenance of
                            future-ready industrial plants            Context
                                                                      Nowadays the market in which EPC Contractors
                                                                      operates is driven by the ongoing energy transition,
                                                                      aiming at reaching internationally, with a challen-
                            Diana Duca, Change Agent in the Transformation   ging change of pace, the carbon neutrality. This,
                            Management Team,                          together with an increase in plant complexity and
                            Valentina Viaro, Change Agent in the      with more and more challenging client contractual
                            Transformation Management Team,           requirements, requires EPC Contractors to easily
                            Maire Tecnimont                           adapt to new international scenarios needs and to
                                                                      minimize the “total cost of ownership”.
                                                                      To do this, Maire Tecnimont, leveraging on its pro-
                                     he Project Control Tower is a Maire Tec-  ven experience as an EPC Contractor, invested in
                                     nimont proprietary reporting hub that   Digital Transformation at a strategic level to increa-
                                     guarantees visibility and control along   se internal operational efficiency and external pro-
                                     the entire EPC project phases, specifi-  cesses competitiveness.
                            T cally:                                  In our digital journey, we aim at providing our clients
                            •   Engineering activities and deliverables status  with a revolutionary approach to Digital Transfor-
                            •   Material management                   mation, combining the DNA of an engineering, pro-
                            •   Construction activities               curement, and construction (EPC) Contractor with


































       28  Impiantistica Italiana - Gennaio-Febbraio 2023
   27   28   29   30   31   32   33   34   35   36   37