Fig. 5 – Structure of the
identifcation code
Conclusions The effective cooperation with the owner is also of
a paramount importance to be able to streamline
Designing and building a cogeneration plant the start-up of the new facilities without disrupting
integrated into an existing chemical plant is a the operation of the chemical complex. This
complex venture requiring specifc skills and successful project has represented a pace setter
know-how. in this respect.
Stefano Occhetta
Stefano Occhetta is a graduated mechanical his career initially in project engineering and since
engineer with 20 years of experience in the industry 2001 in project management. He is currently
all spent with Foster Wheeler. managing the Stade Energy Transformation Project
Stefano has been covering the position of Senior – Cogen Plant at the Dow Chemical Plant in Stade
Project Manager for seven years and has developed (Germany).
Elisabetta Perduca
Elisabetta Perduca, graduated in Electrical such as combined cycles, coal power plants, waste
Engineering at the University of Pavia, joined Foster to energy plants, wind farms. She is usually involved
Wheeler Italiana in 1995 as Electrical Engineer. She in feasibility studies, permitting applications, front-
is now Electrical Manager and currently works as end engineering design, detailed engineering and
Electrical Coordinator for power plant projects. She feld activities, including plant commissioning, start-
has experience in different types of power projects, up and testing.
Silvio arienti
Silvio Arienti graduated in chemical engineering at Silvio Arienti’s experience spans from refning,
Politecnico of Milan and joined Foster Wheeler in 1980. pharmaceutical, petrochemical to power plants. In
In the course of his 33 years of career within the company, the role of Process Manager and Process Director he
Silvio has covered different positions of increasing worked in Combined Cycle and Integrated Gasifcation
responsibility in the process division frst and later on in Combined Cycle projects, in FEED and EPC phase, for
the power division of Foster Wheeler Italiana, where he is important national and international clients world-wide.
now covering the position of Director of Process.
68 Impiantistica Italiana - Novembre-Dicembre 2013