Page 21 - Industrial Plant 2015
P. 21

Borouge, a name, a history made up of                     game and ready to sign this prestigious contract award.
                    experiences, emotions and successes   How to win a competition that we just could not lose?
                    that have enable us to grow and       Hence the decision to partner one of the most feared
                    enthuse. After the successful
                    experience of Borouge 1 and Borouge    The project is part of Adnoc (Abu Dhabi
                    2 Petrochemical complex started in    National Oil Company) strategic initiative
1999, we had the honor to be awarded with the
subsequent Borouge 3 project, representing the largest        aimed at satisfying the increasing
Polyolefins project ever built by Tecnimont.                demand for plastics especially in the
This impressive turnkey EPC (Engineering, Procurement
and Construction) project is composed by 5 process             Middle East and Asian markets
Units, in particular:
•	 2 Polyethylene Units;                                  bidders, Samsung Engineering, and incorporate the so
•	 2 Polypropylene Units;                                 called “TSJ” (Tecnimont Samsung Engineering Joint
•	 1 Low Density Polyethylene Unit (LDPE) of              Venture) with Tecnimont as leader.

      350,000 tons/year through an high pressure          Main stakeholders involved
      technology with unique high quality requirement to
      achieve an extremely clean product.

The package is part of a large portfolio of projects      Client
including an upstream ethylene cracker, utilities and
offsite facilities, a further refining Cross-Linked       Borouge was founded in 1998, when the Austrian
Polyethylene Unit (XLPE) and the non process buildings.   Borealis and Adnoc joined their experience and know-
The project is part of Adnoc (Abu Dhabi National Oil      how to build what today is one of the largest
Company) strategic initiative aimed at satisfying the     petrochemical producing companies in the world. The
increasing demand for plastics especially in the Middle   facilities of Borouge, the largest in the Region with 10
East and Asian markets.                                   main polyolefins process plants, are located in the
The bidding environment during proposal stage was         desert region 250 km West of Abu Dhabi, all
highly aggressive with all the major contractors in the   concentrated in Ruwais area not far from the Saudi
                                                          border.

                                                          Industrial Plants - May 2015

                                                                                                                    19
   16   17   18   19   20   21   22   23   24   25   26