Page 26 - Industrial Plant 2015
P. 26

previously identified long lead items, like plastic   construction subcontractor, represented a key asset
                              extruders, main compressors and process               for the joint venture, especially in meeting the highest
                              reactors, pneumatic transport, high pressure          demand of flexibility imposed by the typology of the
                              equipment and others;                                 works and in the proactive approach put in place to
                        •	 ensuring booking of some raw material in an              handle interfaces among subcontractors.
                              overheated market quite early in the project;         Direct manpower injections have been extensively
                        •	 large use of vendors already adopted in Borouge          used by the joint venture as countermeasure to boost
                              2 project case, as well as vendors adopted by         the progress in specific activities and to sustain
                              other contractor in projects for other Adnoc          subcontractors performance to achieve the challenging
                              Companies, to maximize previous positive              targets set up by the project needs. Moreover, the joint
                              experiences, long term reliability equipment and      venture has also introduced engineers in subcontractors
                              availability of efficient post sales services;        organizations to make sure the correct understanding
                        •	 placing of frame agreements with selected                of contractor deliverables and expectations in specific
                              vendors for specific items, as proactive approach     tasks.
                              to material standardization requirement and better
                              control over sub-vendor performances;                 HSE performance
                        •	 advance availability of material for steel structures
                              erection and pipe fabrication was available on site   Safety, environment and the wellbeing of all the
                              as per the feasibility curves shared with erection    individuals building the plant were of paramount
                              subcontractors;                                       importance for the Tecnimont and Samsung
                        •	 extensive sessions of Factory Acceptance Tests           Engineering, as well as for all the stake holders,
                              for DCS (Distributed Control System) and related      Borouge at first. The contractors and subcontractors
                              control logics in the vendor premises together        complied not only with the HSE (Health Safety
                              with process and automation project leaders, to       Environment) standards of the Adnoc Group, but they
                              assure a positive performance of interlocks and       took several new initiatives in this respect.
                              functional checks during commissioning stage at       Incident Injury Free program, incentives, safety awards
                              site.                                                 and many similar initiatives assimilated the “safety first”
                                                                                    message to all the personnel bringing a culture of
                        Subcontracting strategy                                     safety awareness in the entire project. A permanent
                                                                                    training center was established at site by contractor
                        The construction works were implemented through a           where all the employees, including vendors and labors,
                        pool of specialized subcontractors splitting the overall    have been specifically trained to be able to safely cope
                        scope of work by discipline, such as civil, mechanical,     with the tasks they were called for. The below
                        electrical and instrumentation. This approach was           recognition of intermediate safety achievement was
                        mainly dictated by the need of finding valuable and         distributed to all the thousands of people present at
                        enough resources in the market and by the intention to      site, as sign of appreciation of their attitude versus
                        minimize the risk of failure of a general subcontractor to  safety on site.
                        handle wide portion of works under stringent project        The project finally reached 65 mil worked manhours
                        requirements from several perspectives.                     without LTI (Lost-Time Injury), a remarkable
                        Tecnimont ICB, the totally owned Tecnimont                  achievement in this field, with over 11,000 people

Fig. 5 - Medallion for
achieving 45 million
MHrs without LTI
(Lost-Time Injury)

               Industrial Plants - May 2015