Page 23 - Industrial Plant 2015
P. 23

monitoring the key project features, like HSE (Health     were mobilized to Tecnimont Head Quarter, main
Safety Environment), quality, schedule, cost control      operating center, in a common task force dedicated
and site performances. In addition, two representatives   exclusively for the project. Having Project Management,
from the top management of both companies                 Engineering, Procurement and Project control teams
constituted the joint venture Steering Committee and      located in the same building allowed for a better
acted as sponsors of the project to interact with the     communication and simple coordination.
top management of the client and to ensure that the
project is moving in the right direction and pace.        Tecnimont ICB (Mumbai)
Considering the know-how and capability of Tecnimont
in the petrochemical process and potentiality of the      The detailed engineering on the basis of basic design
Korean market, the initial split of work between          developed by Tecnimont Milan team was executed by
Tecnimont and Samsung Engineering has been done in        the fully owned subsidiary of Tecnimont in India,
a “horizontal” way, with both companies involved in all   Tecnimont ICB (TICB) with headquarters in Mumbai in
the 5 Units, in particular:                               Western India. Around 350 engineers were involved in
                                                          the detailed design engineering phase in TICB and their
Tecnimont (Maire Tecnimont Group)                         contribution was an important milestone in the project.

•	 100% of engineering works for the 5 Polyolefins        Tecnimont Planung und
      Units;                                              Industrieanlagenbau TPI (Salzgitter)

•	 procurement activities with the exception mainly       The design and engineering of the High Pressure
      of the static equipments expected to be awarded     Process Technology of LDPE Unit were performed by
      to Korean vendors;                                  engineers coming from Tecnimont owned subsidiary in
                                                          Germany, with immense experience and knowledge in
•	 construction and commissioning supervision: key        this specialized field.
      positions with high expertise, including field
      engineering team to properly support the            Korean Operating Center (Seoul)
      construction team;
                                                          The key functions performed in this operating center
•	 commissioning execution of LDPE Unit, being a          called KOC (Korean Operation Center), where Samsung
      very specialized task where the process knowhow     headquarters are located, were mainly procurement
      of Tecnimont gained through years of experience     and expediting activities for static equipment and other
      was essential;                                      bulk items, normally purchased by contractors in the
                                                          Far East highly competitive markets. The knowledge of
Samsung Engineering                                       Samsung Engineering in this specific task proved to be
                                                          cost effective.
•	 procurement activities of mainly static equipments
      and some bulk items, where the Korean and Far       Site Operating Center (Ruwais)
      East markets playing a key role in this respect;
                                                          Construction activities were managed and controlled
•	 main construction supervision for all the Units;       by a Single Operations Center (SOC) with base at the
•	 commissioning execution of the 4 Polyolefin            Ruwais site. All the construction subcontracts were
                                                          handled and managed by this location. The joint
      Units;                                              venture PMB, which operated from Milan in the
                                                          engineering and procurement phase moved to SOC
The Operating Centers involved for the execution of the   once those activities were substantially completed.
project engineering, procurement and construction         Also the personnel of client and PMC moved to site at
phases were distributed all over the world as             the same time.
represented in the figure 1.
                                                          Complexity of the project
Operating centers
                                                          Borouge 3 petrochemical complex consists of 5
JV Business office in (Malta)                             independent Process Unit converting ethylene derivates
                                                          into plastic pellets, packed by product handling facilities
The heart of the administration of the joint venture was  either into 25 kg plastic bags or into 40 feet dedicated
located in La Valletta, Malta.

Milan Operating Center (Milan)

Project teams of Tecnimont, few representatives of
Samsung Engineering and Borouge / Bechtel teams

                                                          Industrial Plants - May 2015