Page 92 - impiantistica_3_2015
P. 92
offshore floating units seem offering a good and of 20 or 25 years that correspond basically to
flexible solution to exploit gas reserves. the standard period the unit will be covered by
FLNG offers now an economically feasible solution a classification society. Of course, life extension
for development of gas reserves that were and then extension of class certificate is always
previously perceived as being either stranded or possible but main target of these large scale units
uneconomic by means of traditional schemes. remain to empty a field as quick as possible to be
FLNG is designed as a fully stand-alone system relocated in another field that will maximize again
for field development and, as such, has extensive the production capacity that dropped to only 10%
pre-treatment facilities that can handle untreated of the nominal capacity at the end of the life of a
well fluids, liquefy the cleaned gas and then store it field.
in its own tanks. These liquefaction and treatment With respect to that, Prelude FLNG appears as
systems onboard the floater make independent the first installation of its kind but also the biggest
this unit of any infrastructure and eliminate the need floating unit ever built in the world. With its 488 m
for new pipelines, platforms or separate by-product long and 74 m wide, Prelude will be installed in the
storage. Browse Basin in Australia at approximately 250 m
waterdepth. Once operational, the Prelude FLNG
From small scall to large facility will produce at least 5.3 million tonnes per
scale FLNG annum (mtpa) of liquids: 3.6 mtpa of LNG, 1.3
mtpa of condensate (equivalent to 35,000 bbl/d)
As Shell FLNG Prelude is becoming a reality, and 0.4 mtpa of LPG.
the world is looking forward to see other FLNG
units appearing in the following years. In 2022, The minis
Clarkson Research Services (Jordan D. K., 2014
[3]) estimates that about 22 FLNG units could be It is a common to think that the larger the project
in operation in the world. From small scale FLNG is, the cheaper each produced ton of LNG will be.
projects based inshore to huge FLNG projects However, for very small fields, the reserves are not
located at more than 200 km from coasts, a large always sufficient to justify large LNG plants. This
panel of units is appearing as economical viable concern is particularly relevant when considering
solution. offshore liquefaction plants which are expensive
projects (Jeanneau, 2013 [4]).
The giants Exmar has been the first one to understand the
limitation of huge FLNG and has decided to develop
The family of the mid or large scale FLNG is the its mini-FLNG concept. With 0.5 mtpa and only
most common solution developed by the oil & gas 16,000 m3 storage tank, Caribbean FLNG appears
companies as it allows the development of large as a challenger in the FLNG world. With a barge
fields, often far from coastal areas and where shape solution close to the coastal area, protected
pipelines will be very costly to build. In the case of extreme weather and moored with spud piles,
of large reserves, this solution seems the most Caribbean FLNG is perfectly adapted to develop
adapted one as a higher production capacity will stranded gas reserves that would be inadequate to
allow exploiting resources in an optimum timeframe support a traditional baseload LNG project.
With the drop of oil & gas prices, Exmar considers
Fig. 2 - Offshore LNG
Terminals around the World
90 Impiantistica Italiana - Maggio-Giugno 2015