Page 103 - Industrial Plants
P. 103

Fig. 5 –Module 2 Model                                 Fig. 6 – Module 2


            EPC contractors and Clients on the results of   of the modular project of APS, now nearing completion:
            modularization and this technique is quite recent in the   “Prefabricating modules is an increasingly popular
            Oil and Gas sector. However, the number of modular   strategy in today’s competitive construction and
            projects is increasing and more and more companies   upgrade market, which transformed the  approach to
            are interested in better understanding the potential of   building process systems and plants”.
            the modular execution mode [3].          He goes on to say:
            Modular construction does not come without   “With regard to my project, APS prefabrication strategy
            drawbacks.                               has started with a thorough skills assessment. Certainly,
            One of the biggest challenges associated with   transportation constraint was one of the biggest
            prefabricating modules offsite is transportation.   challenges. The systems had to be designed into





















                                                                                               Fig. 7 – Typical
                                                                                               scheme “Modular VS
                                                                                               Site-built
                                                                                               Construction”
            Modules typically consist of multiple pieces of   portable skids in order to match the predefined cargo
            equipment ancillary piping, control systems and other   dimension of 12000x2700x2600 mm. In only a few
            components on a single skid, for this reason size and   months  we  succeeded  in  delivering  by  railway  and
            weight can be significant.               truck the modules to site. It was an exciting experience
            Shipping logistics and transportation form integral parts   and today’s results show that APS has great potential”.
            of modularization design and are influenced by the
            geographical location of the facility, the type of
            modularization, and the location of the module  Looking at the Russian market

            fabrication yard.                        Oil and gas are the primary assets of Russia in terms of
            This issue is also highlighted by the personal experience   the government revenue they generate and the stable
            of the Project Manager, Mr. Massimo Paris, responsible   economic  growth  and  social development  that  the


                                                                                    IndustrIal Plants - May 2017
                                                                                                                  101
   98   99   100   101   102   103   104   105   106   107   108