ITEM                       QUANTITY

                    Cartridge Filters                 2x100%
                                                      2x100%
               Membrane Contactors Skid
                                           (10 contactors operating in parallel)
               Liquid Ring Vacuum Pump                2x100%
               Preassure Swing Adsorption     2x100% adsorbent vessels;
                Nitrogen Generation Skid        1x100% receiver vessel     membrane contactors is lower (67 mbar) if com-
                                             1x100% pump; 1x100% tank;     pared with both the pressure levels that should be
                       CIP Skid                                            guaranteed in the first (42.9 mbar) and the second
                                                1x100% Cartridge filter
               Instrumentation and Local              Included             (9.7 mbar) vacuum towers stages to gain the same
                     Control Panel                                         performance. In fact, the lower applied vacuum is
                                                                           compensated by the use of Nitrogen stream in the
                Piping, Valves and Wiring             Included             removal of oxygen from water. Plants components
                                                                           of both vacuum towers and membrane deaeration
            Table 3. MDA Module Scope of supply                            project are summarized in Table 3 and Table 4.
                                                                           Results show that membrane deaeration allows, at
                                                                           the same operative conditions, better performan-
                         ITEM                       QUANTITY
                                                                           ces than the vacuum towers (Table 5). Moreover,
                Vacuum Deaeration Tower               1x100%               the membranes are the valid alternative to the va-
                                                                           cuum towers in the case that very low oxygen con-
                Vacuum Generating System     1x100% pump, 1x100% ejector   centrations are required and/or when the adoption
                                                                           of chemicals such as oxygen scavenger is not pos-
                 Injection Booster Pump         1x100% booster pump
                                                                           sible or not available.
              Biocide I Chemical Dosing Skid  1x100% pump, 1x100% tank
              Biocide II Chemical Dosing Skid  1x100% pump, 1x100% tank    4.2 Footprint, volumes, weights
                  Antifoaming Chemical                                     and other aspects of comparison
                      Dosing Skid             1x100% pump, 1x100% tank
               Oxygen Scavanger Chemical                                   In addition to the previous analysis in terms of per-
                      Dosing Skid             1x100% pump, 1x100% tank     formance, the two treatments were also compared
                Instrumentation and Local                                  in terms of overall size (footprint and volume) and
                     Control Panel                    Included             weight (Table 6). This information is very important
                                                                           in order to evaluate any equipment limitations du-
                 Piping, valves and Wiring            Included
                                                                           ring in site installation. In such cases, where there is
                                                                           limited space for installation, it could be very impor-
            Table 4.Vacuum Tower Scope of supply                           tant to have compact and/or low height equipment.
                                                                           In other cases, a limitation on equipment weights
                  TREATMENT            MDA            VT                   can be applied as in the case of oil & gas offshore
                                                                Unit of    sites.
                   Parameter                                               The calculation of volume, footprint and weights
                                                               Measure     in vacuum towers project included the following
                Design Flow rate       92.5          92.5        m /h      equipment: vacuum tower itself, vacuum genera-
                                                                   3
                                                                           tion system, Chemical skids and Booster pump
                 Nitrogen Purity       99.99          NA          %
                                                                           skid. In the case of Membrane deaeration systems,
              Quantity of contactors    10            NA           -       the  calculation included  the  following  equipment:
                   in parallel                                             Membrane deaeration, vacuum generation sy-
                                                                           stem, Cleaning in place skid (CIP) and Nitrogen
             Operative Temperature      4             4           °C
                                                                           Generation system. As for the costs comparison,
                  Vacuum level          67         42.9/9.7      mbar      the equipment and/or the instruments which were
                                                                           common to the VT and MDA systems were not in-
              Gas (Nitrogen) sweep      1.6           NA         Nm /h
                                                                   3
               rate per contactor                                          cluded in the comparison such as the Dual media
                                                                           Filters and the feeding pump. The evaluation were
                                                                   3
                 Vacuum Load           321.8        319.0        m /h      made by the help of the 3D models of the two sy-
             Inlet dissolved Oxygen                                        stems, MDA (Figure 5) and VT (Figure 6).
                (Saturation @ T)       13.8          13.8        ppm       Results show that the deaeration plant based on
                                                                           the utilization of VT has size comparable with that
                 Flow rate per                                     3       of the equivalent project using MDA (both foot-
                   contactor            9.2           NA         m /h      prints are about 33 m ) while volume of VT project
                                                                                            2
                                   Filtration> 98%  Filtration> 98%        is slightly higher (90 m ) than that in case of MDA
                                                                                             3
                  Pretreatment
                                      @ 2 μm        @ 2 μm                 (71 m ).
                                                                                3
               Maximum Dissolved        6.9           50          ppb      Also the weight of the  vacuum tower system  is
                  Oxygen (DO)                                              higher (28 Ton) than that of membrane contac-
                                                                           tors’project (10.2 Ton). Moreover, the innovati-
                Total sweep gas                                    3       ve deaeration system based on the membrane
                   (Nitrogen)          16.1           NA         Nm /h     contactors implies lower volume as well as lower
                                                                           weights.
            Table 5. Performances comparison between MDA and VT            In order to close the comparison between the