Page 109 - 74
P. 109

equipment






                            Keep humidity in check                    For storage purposes, any motors with sleeve be-
                                                                      arings need to be filled with the correct quantity of
                            Motors supplied with space heaters should be   oil as they are normally supplied dry. After every
                            stored with them switched on to avoid humidity   two months of storage, the shaft should be rota-
                            condensation inside the motor. This is achieved by   ted at about 30 rpm for oil circulation. If it is not
                            maintaining the inner temperature of stored motors   possible to rotate the shaft, further instructions for
                            at around 2-3ºC above ambient temperature.    maintaining contact surfaces free of corrosion must
                            The motor’s insulation resistance is another area   be consulted in the motor’s manual. Starting the
                            of concern. After prolonged storage, winding in-  motor after a long storage period without correct
                            sulation resistance needs to be measured before   care of the bearing system can cause failure and
                            operating the motor. If the ambient atmosphere   the destruction of the sleeve bearings.
                            has high levels of humidity, these measuring tasks
                            needs to be periodic. Limit values defined by IEEE-
                            43 must be checked. If the test is performed at a  Conduct thorough periodic
                            temperature different  to 40ºC,  it  is  necessary  to   inspections to evaluate motor
                            correct the value according to IEEE-43 correction
                            curves.                                   condition
                            When checking for winding insulation resistance,   In all cases, periodic motor inspections should be
                            the terminal boxes should also be observed to see   conducted for any signs of physical damage, con-

























                            Image 2: The correct installation and operation of flameproof motors is essential to maximise the life expectancy of ma-
                            chinery operating in hazardous environments


                            if: the interior is dry and free of any dust accumula-  For storage purposes, any
                            tion; the contact elements are free of corrosion; the   motors with sleeve bearings
                            flameproof joint is free of corrosion and any kind of
                            damage or scratches; and the cable inlets are cor-  “need to be filled with the correct
                            rectly sealed with certified cable glands (or certified   quantity of oil as they are
                            plugs if not in use).                         normally supplied dry

                            Protect joints and surfaces
                            from corrosion                            tamination or the presence of water condensation
                                                                      or other aggressive agents. Checking ambient and
                            Flameproof joints need to be free of corrosion.   winding  temperatures, relative  humidity, and  re-
                            Therefore,  prior  to  assembly  following prolonged   cording the vibrations during storage, are vital to
                            storage, the enclosure’s flameproof joint surfaces   achieving a correct evaluation of a motor’s status
                            must be protected against corrosion with grease.   before start-up.
                            Similarly, with motor bearings, any prolonged sto-  Following long-term storage, the motor should be
                            rage periods make it necessary to remove the shaft   cleaned and dried before start-up. The corrosion
                            locking device and rotate the shaft manually every   inhibitor of exposed machined surfaces,  such as
                            two months. After rotation, the end position of the   the shaft end, must be removed using a cloth soa-
                            shaft should be 45º from its initial position. For sto-  ked in petroleum-based solvent. It must also be
                            rage times greater than six months, the bearings   guaranteed that any enclosure entry is fitted with a
                            will require greasing before start-up.     certified plug, drain or cable gland depending on its


       102  Impiantistica Italiana - Luglio-Agosto 2019
       102
   104   105   106   107   108   109   110   111   112   113   114