Page 30 - 78
P. 30
INFRASTRUTTURE
Norway,» in CIGOS 2019, Innovation for Sustainable
Infrastructure , Singapore, 2019.
[7] A. GhaffarianHoseini, T. Zhang, O. Nwadigo, A. Ghaf-
farianHoseini, N. Naismith, J. Tookey e K. Raahemi-
far, «Application of nD BIM Integrated Knowledge-
based Building Management System (BIM-IKBMS)
for inspecting post-construction energy efficiency.,»
Renewable and Sustainable Energy Reviews., vol.
72, pp. 935-949, 2017.
[8] R. Jin, C. M. Hancock, L. Tang e D. Wanatowski,
«BIM Investment, Returns, and Risks in China’s AEC
Industries.,» Journal of Construction Engineering
and Management , vol. 143, n. 12, 2017.
[9] R. Eadie, M. Browne, H. Odeyinka, C. McKeown e
S. McNiff, «BIM implementation throughout the UK
construction project lifecycle: An analysis.,» Automa-
tion in construction, vol. 36, pp. 145-151, 2013.
[10] M. Gerges, S. Austin, M. Mayouf, O. Ahiakwo, M.
Jaeger, A. Saad e T. El Gohary, «An investigation into
the implementation of building information modeling
in the Middle East.,» Journal of Information Techno-
logy in Construction., vol. 22, pp. 1-15, 2017.
[11] C. Tomovic, N. L. B., A. Walton e M. Grieves, «Deve-
lopment of Product Lifecycle Management metrics:
Measuring the impact of PLM.,» International Journal
of Manufacturing Technology and Management., pp.
167-179, 2010.
[12] J. Stark, Product Lifecycle Management vol.1 21st
Century Paradigm for Product Realisation, Geneva,
Scheda Informativa Pump nata, verifica delle modifiche, inseguire le richieste Switzerland: Springer doi: 10.1007/978-0-85729-
di cambiamento, ecc.. Infine, supporta la ben nota 546-0, 2015 .
catena del valore del dato (anche nota come la [13] ARC, «Product Lifecycle Management Solution Pro-
DIKW pyramid) che tramite meccanismi di connes- viders Seek to Expand into New Industries,» 10 sept.
sione, manipolazione, interazione ecc., evolve in in- 2018. [Online]. Available: https://www.arcweb.com/
formazioni, conoscenza, esperienza dell’impianto. market-studies/product-lifecycle-management.
[14] A. Corallo, M. Latino, M. Lazoi, S. Lettera, M. Mar-
Riferimenti ra e S. Verardi, «Defining product lifecycle mana-
gement: A journey across features, definitions, and
[1] B. Succar, «Building information modelling fra- concepts.,» ISRN Industrial Engineering, 2013.
mework: A research and delivery foundation for in- [15] G. Mangialardi, C. Di Biccari, C. Pascarelli, M. Lazoi
dustry stakeholders.,» Automation in Construction, e A. Corallo, « BIM and PLM Associations in Current
pp. 357-375, 2009. Literature,» in IFIP International Conference on Pro-
[2] H. Penttilä, « “Describing the changes in architec- duct Lifecycle Management, Springer, Cham., 2017,
tural information technology to understand design pp. 345-357.
complexity and free-form architectural expression,» [16] J. Jupp, “Cross industry learning: a comparative
Journal of Information Technology in Construction study of product lifecycle management and building
(ITcon), pp. 395-408, 2006. information modelling,” Int. J. Product Lifecycle Ma-
[3] EP, Directive 2014/24/EU of the European Parlia- nagement, vol. 9, no. 3, pp. 258-284, 2016.
ment and of the Council of 26 February 2014 on pu- [17] H. Mattern and M. König, “ BIM-based modeling
blic procurement and repealing Directive 2004/18/ and management of design options at early planning
EC, 2014. phases.,” Advanced Engineering Informatics, no. 38,
[4] EP, Directive 2014/25/EU of the European Parlia- pp. 316-329, 2018.
ment and of the Council of 26 February 2014 on pro- [18] P. Mujumdar e J. U. Maheswari, «Design iteration in
curement by entities operating in the water, energy, construction projects–Review and directions.,» Ale-
transport and postal services sectors and repealing xandria engineering journal, vol. 52, n. 1, pp. 321-
Directive 2004/17/EC, 2014. 329, 2018.
[5] MIT, «Decreto del Ministero delle infrastrutture e dei [19] P. Sanguinetti, S. Abdelmohsen, J. Lee, J. Lee, H.
Trasporti N. 560 01/12/2017,» 2017. Sheward e C. Eastman, «General system architec-
[6] N. Bui, «The contextual influence on Building In- ture for BIM: An integrated approach for design and
formation Modelling implementation: A cross-case analysis.,» Advanced Engineering Informatics., vol.
analysis of infrastructure projects in Vietnam and 26, n. 2, pp. 317-333, 2012.
28 28 Impiantistica Italiana - Marzo-Aprile 2020