Page 30 - 78
P. 30

INFRASTRUTTURE











                                                                         Norway,» in CIGOS 2019, Innovation for Sustainable
                                                                         Infrastructure , Singapore, 2019.
                                                                      [7]   A. GhaffarianHoseini, T. Zhang, O. Nwadigo, A. Ghaf-
                                                                         farianHoseini, N. Naismith, J. Tookey e K. Raahemi-
                                                                         far, «Application of nD BIM Integrated Knowledge-
                                                                         based Building Management System (BIM-IKBMS)
                                                                         for inspecting post-construction energy efficiency.,»
                                                                         Renewable and Sustainable Energy Reviews., vol.
                                                                         72, pp. 935-949, 2017.
                                                                      [8]   R. Jin, C. M. Hancock, L. Tang e D. Wanatowski,
                                                                         «BIM Investment, Returns, and Risks in China’s AEC
                                                                         Industries.,» Journal of Construction Engineering
                                                                         and Management , vol. 143, n. 12, 2017.
                                                                      [9]   R. Eadie, M. Browne, H. Odeyinka, C. McKeown e
                                                                         S. McNiff, «BIM implementation throughout the UK
                                                                         construction project lifecycle: An analysis.,» Automa-
                                                                         tion in construction, vol. 36, pp. 145-151, 2013.
                                                                      [10]  M. Gerges, S. Austin, M. Mayouf, O. Ahiakwo, M.
                                                                         Jaeger, A. Saad e T. El Gohary, «An investigation into
                                                                         the implementation of building information modeling
                                                                         in the Middle East.,» Journal of Information Techno-
                                                                         logy in Construction., vol. 22, pp. 1-15, 2017.
                                                                      [11]  C. Tomovic, N. L. B., A. Walton e M. Grieves, «Deve-
                                                                         lopment of Product Lifecycle Management metrics:
                                                                         Measuring the impact of PLM.,» International Journal
                                                                         of Manufacturing Technology and Management., pp.
                                                                         167-179, 2010.
                                                                      [12]  J. Stark, Product Lifecycle Management vol.1 21st
                                                                         Century Paradigm for Product Realisation, Geneva,
       Scheda Informativa Pump   nata, verifica delle modifiche, inseguire le richieste   Switzerland: Springer doi: 10.1007/978-0-85729-
                            di cambiamento, ecc.. Infine, supporta la ben nota   546-0, 2015 .
                            catena  del  valore  del  dato  (anche  nota  come  la   [13]  ARC, «Product Lifecycle Management Solution Pro-
                            DIKW pyramid) che tramite meccanismi di connes-  viders Seek to Expand into New Industries,» 10 sept.
                            sione, manipolazione, interazione ecc., evolve in in-  2018. [Online]. Available: https://www.arcweb.com/
                            formazioni, conoscenza, esperienza dell’impianto.  market-studies/product-lifecycle-management.
                                                                      [14]  A. Corallo, M. Latino, M. Lazoi, S. Lettera, M. Mar-
                            Riferimenti                                  ra e S. Verardi, «Defining product lifecycle mana-
                                                                         gement: A journey across features, definitions, and
                            [1]   B. Succar, «Building information modelling fra-  concepts.,» ISRN Industrial Engineering, 2013.
                                mework: A research and delivery foundation for in-  [15]  G. Mangialardi, C. Di Biccari, C. Pascarelli, M. Lazoi
                                dustry stakeholders.,» Automation in Construction,   e A. Corallo, « BIM and PLM Associations in Current
                                pp. 357-375, 2009.                       Literature,» in IFIP International Conference on Pro-
                            [2]   H. Penttilä, « “Describing the changes in architec-  duct Lifecycle Management, Springer, Cham., 2017,
                                tural  information technology  to understand  design   pp. 345-357.
                                complexity and free-form architectural expression,»   [16]  J. Jupp, “Cross industry learning: a comparative
                                Journal of Information Technology in Construction   study of product lifecycle management and building
                                (ITcon), pp. 395-408, 2006.              information modelling,” Int. J. Product Lifecycle Ma-
                            [3]   EP, Directive 2014/24/EU of the European Parlia-  nagement, vol. 9, no. 3, pp. 258-284, 2016.
                                ment and of the Council of 26 February 2014 on pu-  [17]  H.  Mattern and M.  König,  “  BIM-based  modeling
                                blic procurement and repealing Directive 2004/18/  and management of design options at early planning
                                EC, 2014.                                phases.,” Advanced Engineering Informatics, no. 38,
                            [4]   EP, Directive 2014/25/EU of the European Parlia-  pp. 316-329, 2018.
                                ment and of the Council of 26 February 2014 on pro-  [18]  P. Mujumdar e J. U. Maheswari, «Design iteration in
                                curement by entities operating in the water, energy,   construction projects–Review and directions.,» Ale-
                                transport and postal services sectors and repealing   xandria engineering journal, vol. 52, n. 1, pp. 321-
                                Directive 2004/17/EC, 2014.              329, 2018.
                            [5]   MIT, «Decreto del Ministero delle infrastrutture e dei   [19]  P. Sanguinetti, S. Abdelmohsen, J. Lee, J. Lee, H.
                                Trasporti N. 560 01/12/2017,» 2017.      Sheward e C. Eastman, «General system architec-
                            [6]   N. Bui, «The contextual influence on Building In-  ture for BIM: An integrated approach for design and
                                formation Modelling implementation: A cross-case   analysis.,» Advanced Engineering Informatics., vol.
                                analysis of infrastructure projects in Vietnam and   26, n. 2, pp. 317-333, 2012.

       28 28  Impiantistica Italiana - Marzo-Aprile 2020
   25   26   27   28   29   30   31   32   33   34   35