OFFSHORE






                            located under the bolted on jacket clamps which   the ships. This is how global transport, logistics
                            had fitted previously. This was achieved by using   and heavy engineering specialist Fagioli developed
                            the SPMTs own lift capacity and moved to the desi-  a unique jack-up system for heavy-duty transport
                            gnated load out area for final fit out and preparation   projects. This dynamic system working in combi-
                            for shipping.                             nation with SPMT fleet offered the suitable solution
                            When the specially fitted out Ro-Ro vessel docked   with its limitless new possibilities for future load out
                            at the port side the process was repeated only   operations.
                            this time the designated SPMT configuration   The jack-up system was installed onto the deck of
                            employed the use of one of the most powerful   the SPMT trailers and immediately demonstrated
                            Enerpac hydraulic jack up system ever used on an   its full versatility with the transportation and load-
                            SPMT configuration with a combined 4 point lifting   out operations of oversized offshore wind farm ja-
                            capacity of over 2,000 tons of lift capability – yet   ckets with weights reaching over 1,800 tons and
                            another first for Fagioli. This was done to gain the   heights of up to 80 meters. The jackets were safely
                            necessary lift to be able to place the Jackets into   transported at the full height, then upon reaching
                            the ships specially fabricated loading positions, into   the final set down position on the roll-on/roll-off
                            which the jacket legs were lowered and locked into   vessel, the jackets are then safely lowered down
                            position for the sea journey.             into the grillage.”
                            This  process  was  repeated  for  a  total  of  86   The entire transport system was comprised of th-
                            successfully executed load out operations, that’s a   ree main elements: 96 Axle Lines of self-propelled
                            total load out of 150,000.00 metric tons performed   modular  transporters  with  a  combined  payload
                            without any accidents, damage or mechanical   capacity of 4,608 tons, an jack-up system with
                            failures. The biggest impediment faced by the   four electronically synchronized lifting towers with
                            Fagioli team was tidal swell which dictated that a   a capacity of 2,400 tons and specialized modular
                            significant number of load out operations were to   transport beams fabricated by Fagioli, each with a
                            be performed at night and often in tropical weather   23 meters span in the standard format.
                            conditions  which  sometimes  included  monsoon   These three elements each have the potential to
                            like conditions (Picture 4).              be adjusted to suit the project requirements. The
                            The pre-planning aspect included detailed   utilization of such a jack-up system configuration
                            engineering studies and fabrication of dedicated   allows for a smooth and cost-effective roll-on
                            steel structures for the transport and load-out   operation, as well as internal yard movements in
                            operations.                               compliance with the standard DNV-GL requirements
                            Thinking outside the box…..allowed us to discover   for load-out projects. SPMT Configuration was
                            new concepts and to pursue innovative ideas, in   used with both 3-Points of Hydraulic suspension,
                            order to accomplish the challenging task to move,   or with 4-points in case higher level of stability
                            lift, rotate, assemble and transport the jackets onto   was required. Lifting (Jack Up and Jack Down)





































                      Pict. 4