Page 18 - Impiantistica Industriale
P. 18

TRANSPORT INFRASTRUCTURE

















                            Table 1 – Data on Existing Offshore Pipelines in North Europe eligible for repurposing to H  and CO  Transport (ref. Re-
                                                                                         2
                                                                                               2
                            Stream study)
                            The challenge for the pipeline designer is that no   methodical and pragmatic, with a learning by doing
                            hydrogen pipelines offshore exist today, very few   approach.
                            are the CO  ones, repurposing activities are mo-  The innovation plan was organized in three phases
                                     2
                                              stly limited to life extension   (Picture 3), each including various work packages.
           In 2021 a study, Re-stream,        of existing pipeline without   The first phase was dedicated to deepening
           commissioned by important          changing significatively the   knowledge on the two fluids and identify the gaps
                                              type of fluid transported.
                                                                      where additional R&D effort was required. The se-
      “O&G associations, analysed                                     cond phase was focused to design and start filling
           the feasibility of repurposing     In addition, the new scena-  the  gaps.  Some  case studies  were selected  for
                                                                      new or repurposed offshore pipelines to transport
                                              rios oblige to a transforma-
           the European gas and oil           tion in the design approach   H  or H /NG or CO . The study cases for pure
                                                                                      2
                                                                       2
                                                                            2
           infrastructure to transport        that should primarily consi-  hydrogen considered a new pipeline transporting
           Hydrogen or CO                     der that some of the new   hydrogen from an offshore electrolyser to shore,
                            2                 molecules to be transported   while for hydrogen blended with natural gas it was
                                              have an interaction with the   analysed the re-use of an existing offshore pipe-
                                              integrity of the pipe material   line in the Mediterranean sea. The study case for
                            itself. Therefore, as part of the change, it is to be   CO  considered  the reuse of an existing flowline
                                                                        2
                            considered the testing of material properties under   system between two platforms and the shore, re-
                            various conditions, to support and provide a strong   versing the flow direction to transfer captured CO
                                                                                                            2
                            scientific base to the standardization process of the   from land industrial sources to subsea injection and
                            design.                                   storage. The Table 2 below presents the main cha-
                                                                      racteristics of all the case studied within the rese-
                            Advancing the innovation                  arch program.
                            process in technology                     To fill some knowledge and technological gaps and
                                                                      to conduct experimental test campaign, a coope-
                            After a preliminary state of art review, it was re-  ration with research entities and laboratories, like
                            cognized that there were gaps to be filled from a   Politecnico di Milano and RINA, was started inclu-
                            technological point of view and a roadmap was   ding the active participation to an important Joint
                            established to fill them. All engineering disciplines   Industry Project, DNV (Det Norske Veritas) JIPH2Pi-
                            of offshore pipeline design were involved in this   pe (Joint Industry Project on Hydrogen Pipelines).
                            process considering both  JIP adjoining and ex-  The third phase is ongoing with the ultimate objec-
                            perimental test campaigns. The intent was to be   tive to provide data and information to the engi-

       Picture 3 – Saipem R&D Pro-
       gram  on  H  and CO  Pipeli-
                     2
               2
       nes Offshore - Activities Bre-
       akdown


















       14  Impiantistica Italiana - Maggio-Giugno 2023