Table 1 – Data on Existing Offshore Pipelines in North Europe eligible for repurposing to H  and CO
                                                                                                 2
                                                                                                        2
                             Transport (ref. Re-Stream study)
                    In 2021 a study,    In addition, the new scenarios oblige to   R&D effort was required. The second phase was
                      Re-stream,        a transformation in the design   focused to design and start filling the gaps. Some case
                   commissioned by      approach that should primarily consider   studies were selected for new or repurposed offshore
                    important O&G       that some of the new molecules to be   pipelines to transport H  or H /NG or CO . The study
                                                                                            2
                                                                                                    2
                                                                                       2
                     associations,      transported have an interaction with   cases for pure hydrogen considered a new pipeline
                       analysed         the integrity of the pipe material itself.   transporting hydrogen from an offshore electrolyser to
                    the feasibility of   Therefore, as part of the change, it is to   shore, while for hydrogen blended with natural gas it
                    repurposing the     be considered the testing of material   was analysed the re-use of an existing offshore pipeline
                   European gas and     properties under various conditions, to   in the Mediterranean sea. The study case for CO
                                                                                                            2
                  oil infrastructure to   support and provide a strong scientific   considered  the reuse of an existing flowline system
                  transport Hydrogen    base to the standardization process of   between two platforms and the shore, reversing the
                         or CO          the design.                    flow  direction  to  transfer  captured  CO   from  land
                              2                                                                     2
                                                                       industrial sources to subsea injection and storage. The
                                                                       Table 2 below presents the main characteristics of all
                             Advancing the innovation                  the case studied within the research program.

                             process in technology
                                                                       To fill some knowledge and technological gaps and to
                             After a preliminary state of art review, it was recognized   conduct experimental test campaign, a cooperation
                             that there were gaps to be filled from a technological   with research entities and laboratories, like Politecnico
                             point of view and a roadmap was established to fill   di Milano and RINA, was started including the active
                             them. All engineering disciplines of offshore pipeline   participation to an important Joint Industry Project,
                             design were involved in this process considering   DNV (Det Norske Veritas) JIPH2Pipe (Joint Industry
                             both JIP adjoining and experimental test campaigns.   Project on Hydrogen Pipelines).
                             The intent was to be methodical and pragmatic, with a   The third phase is ongoing with the ultimate objective
                             learning by doing approach.               to provide data and information to the engineering
                             The innovation plan was organized in three phases   disciplines involved in pipeline design, to develop
                             (Picture 3), each including various work packages.   recommendations and guidelines or procedures and fit
                             The first phase was dedicated to deepening knowledge   for purpose design tools, to consolidate a network of
                             on the two fluids and identify the gaps where additional   suppliers ready for the new scenarios, to elaborate and



         Picture 3 – Saipem
         R&D Program on H
                        2
         and CO  Pipelines
               2
         Offshore - Activities