after 47 years of service

Images taken on site, before the overhaul  Whether as a drive for pumps and         ginally scheduled as four to five weeks intervention,
During the reassembly                      compressors in upstream, midstre-        the work was completed with a down time of just
Overhauled unit                            am or downstream applications            two weeks, getting the coupling back into service
                                           in the oil&gas industry or as boiler     weeks ahead of schedule.
                                           feed pump drive for power plants,        During the assignment the unit was completely
                                           the geared variable-speed cou-           dismantled and deeply cleaned. Dimensional and
                                           plings from Voith have become in-        non-destructive tests were carried out to evaluate
                                           dispensable when it comes to ma-         the condition of the power transmitting parts; all
                                           ximum reliability.                       the main bearings, the working oil, lube oil and au-
                                           Combining a hydrodynamic va-             xiliary lube oil pump bearings and all the wear parts
                                           riable-speed coupling and a gear         were replaced. The filter was updated with a more
                                           unit in a joint housing, the special     recent cartridge system and also safety items such
                                           feature of geared variable speed         as lifting lugs were replaced with new ones.
                                           couplings from Voith is that they        The refurbishment of the damaged output shaft re-
                                           provide three functions in one ma-       quired balancing of the output runner, which was
                                           chine: Speed control, speed incre-       performed in the dedicated production facility lo-
                                           ase (gearbox), and an integrated oil     cated in Crailsheim (Germany). The machine was
                                           supply that delivers oil to the entire   recommissioned in the completely overhauled train
                                           drive train.                             with a Voith field service engineer supervising the
                                           The variable-speed coupling              on-site activities.
                                           adapts the speed of the driven           Now the geared variable speed coupling is rea-
                                           machine to the process needs.            dy to continue performing its job for many years,
                                           Customers can save a considera-          transmitting power wear free and controlling the
                                           ble amount of energy compared to         boiler feed pump speed very precisely, while al-
                                           other control technologies such as       lowing the operator to achieve a reduction in po-
                                           a throttle control. With recommen-       wer consumption.
                                           ded overhaul intervals of eight years    Voith currently overhauls another unit for the same
                                           and a working life exceeding thirty      customer to be put into service in near future in
                                           years the servicing is also kept at      another power plant.
                                           minimum. Unplanned downtimes             Voith Turbo, a Group Division of Voith GmbH, is a
                                           are also prevented thanks to a re-       specialist for intelligent drive solutions. Customers
                                           liability of 99.97%.                     from highly diverse industries such as oil and gas,
                                           Recently, a geared variable speed        energy, mining and mechanical engineering, ship
                                           coupling type R16K was overhau-          technology, rail and commercial vehicles rely on
                                           led at Voith workshop facilities in      advanced technologies from Voith Turbo.
                                           Reggio Emilia (Italy). The R16K was      Voith sets standards in the markets for energy,
                                           built and commissioned in 1969 for       oil&gas, paper, raw materials, transport & automo-
                                           speed control of a boiler feed pump      tive. Founded in 1867, employs more than 20,000
                                           in a power plant in the south of Italy.  people, generates 4.3 billion euros in sales, ope-
                                           Although the R16K coupling was           rates in over 60 countries around the world and
                                           still performing well, the company       is one of the largest family owned companies in
                                           operating the power plant had de-        Europe.
                                           cided to completely overhaul one of
                                           the two parallel running trains. Ori-                                                  www.voith.com

                                                                                    Impiantistica Italiana - Settembre-Ottobre 2016 93
   92   93   94   95   96   97   98   99   100   101   102