been developed and ap-    transmission  capacities  may help  to select
                                               plied for many hundreds of   power from cheaper (including environmen-
                                               km in Italy, Switzerland and   tal costs) units located in another region or
                                               Egypt (the figure 8 shows   country and to capture the best of renewables
                                               an OHTL arriving at the   sources;
                                               Cairo South substation)   •   both  AC  and  DC  technologies  are  available
                                               in the voltage level range   for systems above 1000 kV for OHTL’s (1200
                                               from 145 to 400 kV. This is   kV AC in India and 1100 kV DC in China) and
                                               a cheap alternative to tu-  up to 600 kV for sea / underground cables.
                                               bular poles by presenting   Sea cables have been developed for depths
                                               light bi-dimensional towers   exceeding 3000 m. The DC transmission up
                                               and small foundations.    to 3500 km in length is under construction in
                                               Among the tubular pole    China.  FACTS  technologies  have had  great
                                               types, the one in figure 9   improvements  in  AC  systems.  There  are  no
                                               is of interest with the use   limits for technologies but the key issue is the
                                               of post  type insulators  to   increasingly strong opposition to building new
                                               minimize the impact on the   OHTLs and the very long times to implement
                                               environment and minimum   them.
                                               RoW width.             •   The average time in the EU from the concep-
                                               Some interesting new line   tual engineering of a new HV OHTL of some
                                               sections are reported in fi-  dozens of kilometers to its commissioning
                                               gure 10.                  phase, is longer than 10 years and sometimes
                                               Also in this area there are   becomes infinite, when it is impossible to arrive
                                               no limits to imagination for   at the final completion. The Spain – France in-
                                               improvements but not only   terconnection, now in operation, has taken 25
                                               Capex costs should be     years to complete, the Matera – Santa Sofia in
                                               carefully analyzed, but also   Italy has required 18 years, while in China less
       Fig. 7 - Varieties of AC lines   O&M costs which are becoming critical in some of   than 4 years were needed from initial thinking
       to increase transfer capacity   the above mentioned solutions. For all the above   to commissio-
       with lower impact on the en-  towers/lines, insulator assemblies and types of in-  ning of a 2000
       vironment [5]        sulators play a fundamental role.            km long ± 800
                                                                         kV   UHVDC
                            2.3 Dynamic loading of OHTL’s                line  carrying
                                                                         7000 MW.
                            The  possible  increase  of  power  transfer  on  an   Interconnectors
                            OHTL in specific and not rare favorable atmosphe-  are also a mean to
                            ric conditions (low temperatures, or no sun or pre-  fostering  a  higher
                            sence of rain or wind to dissipate the heat), with   penetration of RES
                            the aid of line monitoring of conductor current/tem-  with  consequent
                            perature/ambient conditions allows larger transfer   reduction of GHG
                            capacity in the great majority of hours with respect   (Greenhouse Gas  Fig. 8 - A cheap alternative for
                            to a deterministic limit of maximum current valid in   Emissions). Sub-  compact lines as applied in Cairo
                            extreme / very rare conditions. Adequate sensors   Sahara Africa has   suburbs (Egypt)
                            and communication facilities, already well develo-
                            ped, are involved.

                            2.4 Interconnections between
                            countries and transmission
                            of bulk powers from remote /
                            economic sources

                            The interconnection benefits are political, technical,
                            economic and environmental:
                            •   the development of interconnections capacity
                                between countries (or regions) allows greater
                                electrical system reliability and flexibility in the
                                generation mix and operations, improving se-  Fig. 9 - Tubular pole line with two conductors per phase,
                                curity of energy supply;             no ground wires and arrester to protect from lightning faults
                            •   the availability of cross-border/cross region  on the top phase