Fig. 9 - Layout and pictures of the lifting of two modules, including the biggest one (~100 tons)

                engineering phase were of primary importance to   achieving zero hazardous events.
                installation success and consequently for   Of course modular fabrication, which was the biggest
                complying with turnaround schedule.   key to success, required high level of engineering,
                                                      planning and specialized labor force; nevertheless facts
                                                      say that the global time saving revenue was enough to
            Conclusions                               compensate such bigger cost.

            The path that led Vergaengineering to win such   This successful project had a particular sweet
            challenge essentially passed through proper   flavor for Vergaengineering SpA, as it increased its
            preparation: i.e. accurate survey, smart design and   leading role in fired heater solutions, by
            high construction quality. The job also coped with the   consolidating its know-how, especially on
            highest safety requirements, with a strong focus on   revamping and modularization jobs.








                                Roberto Canesi



                                Roberto is a Senior Project Engineer at Vergaengineering   the Politecnico di Milano and a MS in Nuclearing
                                SpA, where he also served as Deputy Construction   Engineering from the same University.
                                Manager. He holds a BS in Chemical Engineering from






                                Ettore Garzoglio



                                Ettore is Managing Director at Vergaengineering SpA.   AICHE (American Institute of Chemical Engineers) and
                                He holds a MS in Business Engineering from the   API (American Petroleum Institute). He acted as
                                Politecnico di Milano and has over 25 years of   Sponsor of this project.
                                experience in the Fired Heaters Industry. Member of




                                                                                    IndustrIal Plants - May 2018
                                                                                                                   29
   28   29   30   31   32   33   34   35   36   37   38