Fig. 9 - Layout and pictures of the lifting of two modules, including the biggest one (~100 tons)
engineering phase were of primary importance to achieving zero hazardous events.
installation success and consequently for Of course modular fabrication, which was the biggest
complying with turnaround schedule. key to success, required high level of engineering,
planning and specialized labor force; nevertheless facts
say that the global time saving revenue was enough to
Conclusions compensate such bigger cost.
The path that led Vergaengineering to win such This successful project had a particular sweet
challenge essentially passed through proper flavor for Vergaengineering SpA, as it increased its
preparation: i.e. accurate survey, smart design and leading role in fired heater solutions, by
high construction quality. The job also coped with the consolidating its know-how, especially on
highest safety requirements, with a strong focus on revamping and modularization jobs.
Roberto Canesi
Roberto is a Senior Project Engineer at Vergaengineering the Politecnico di Milano and a MS in Nuclearing
SpA, where he also served as Deputy Construction Engineering from the same University.
Manager. He holds a BS in Chemical Engineering from
Ettore Garzoglio
Ettore is Managing Director at Vergaengineering SpA. AICHE (American Institute of Chemical Engineers) and
He holds a MS in Business Engineering from the API (American Petroleum Institute). He acted as
Politecnico di Milano and has over 25 years of Sponsor of this project.
experience in the Fired Heaters Industry. Member of