Direct working hours spent on the project were ap-  Commissioning and qualification was executed on
                                  proximately 200,000 up to mechanical completion.  a total of 93 systems with integrated team of Brac-
                                  Construction companies were Italian based, while   co, legacy Amec Foster Wheeler and Contractors.
                                  the civil construction and the finishing trades were
                                  from the Baden Württemberg area.
                                  The 500 m  of offices, meeting room, and en- Conclusions
                                           2
                                  trance hall were realised, in the last period of the   Designing and building a new facility plant integrat-
                                  construction, to avoid possible damages of the fi-  ed into an existing site is a complex venture requir-
                                  nishing, with dedicate small civil contractors and   ing specific skills and know-how. The disruption to
                                  with direct material purchasing by us and Bracco.  site operation has to be minimised.
                                  Cooperation among the different entity was successful,   The realisation of the “Hermes Project” was a suc-
                                  with mentioning to the plant handover process that   cessful example of planning and cooperation in a
                                  was encompassing a total of 119 Turnover Systems.  multicultural environment.












                                  Alessandro Mencarelli



                                  Alessandro is a graduated Chemical Engineer with   Europe and in Asia including site assignments for
                                  over 14 years’ experience in Engineering and Proj-  construction and commissioning. Among the dif-
                                  ect Management in the Pharma group of Amec   ferent project types followed (infrastructure, bulk,
                                  Foster Wheeler (now Wood).               packaging and labs), the most significant experi-
                                  Alessandro’s experience has matured through the   ence was gained in medium to large biotech facili-
                                  execution of all project phases (Conceptual, Ba-  ties with the associated GMP aspects.
                                  sic  and EPC) for  major and complex projects in