Page 63 - 63
P. 63

•   building description;
                                                                           •   operation description;
                                                                           •   building application drawings, including heat-
                                                                               ing and energy calculation;
                                                                           •   sewage drawings and calculation;
                                                                           •   fire safety concept;
                                                                           •   site security.
                                                                           In particular, German Renewable Energies Heat Act
                                                                           (EEWärmeG) was considered for the design of the
                                                                           building envelope, the chiller typology and the warm
                                                                           water production. The regulation, in fact, stipulates
                                                                           that owners of new buildings must cover a certain
                                                                           quota of their heat supply with renewable energies.


                                                                           Landesbauordnung and Static Proof
                                                                           The building was designed and realised completely
                                                                           with reinforced concrete (cast in situ). It’s a com-
                                                                           mon design solution rather than prefabricated ele-
                                                                           ments for such kind of application and it gives a
            Fig. 3 - Quality Control room                                  certain flexibility for the plant penetration through
            with Pure Water sink                                           the different building levels without needs of addi-
                                                                           tional reinforcement.
                                  Wirth-Kramer.                            The structural design, up to the issue for construc-
                                  The permit package consists mainly of drawings   tion was done by Amec Foster Wheeler in partner-
                                  and documents with the specific purpose to co-  ship with the local Architect studio.
                                  ver all the planning and construction aspects of the   The authorisation to erect every single structural
                                  project such as:                         item is also subject to the release of the correspon-
                                  •   unit plot plan;                      dent Static Proof Report (Prüfbericht) by the Proof
                                  •   official application forms;          Engineer. Through this report the Proof Engineer
                                  •   building areas and raw & net volumes with   certifies the conformity with the static design re-
                                     cost estimates;                       flected in the static calculations and in the related
                                                                                               shop drawings.
                                                                                               The Proof Engineer is
                                                                                               an independent consult-
                                                                                               ing company selected
                                                                                               and contracted by the
                                                                                               local authority to carry
                                                                                               out the review of the
                                                                                               static design of every
                                                                                               structural item. In this
                                                                                               respect also the steel
                                                                                               structures for the acces-
                                                                                               sibility and maintenance
                                                                                               for equipment as well
                                                                                               as  structural  support-
                                                                                               ing of piping might be
                                                                                               subject of his review.
                                                                                               Once the review is sat-
                                                                                               isfactorily  completed,
                                                                                               the Proof Engineer puts
                                                                                               the stamp of certification
                                                                                               (geprüft), onto the static
                                                                                               calculations (Statische
                                                                                               Berechnung) and shop
                                                                                               drawings  (Ausführung
                                                                                               Zeichnungen).
                                                                                               During the site construc-
                                                                                               tion the site legal respon-
                                  Fig. 4 - Technical Area with AHU (Air Handling Unit) installation  sibility is belonging to the



                                                                                   Impiantistica Italiana - Maggio - Giugno 2018  61
   58   59   60   61   62   63   64   65   66   67   68