Page 49 - Impiantistica Italiana
P. 49
Picture 11 - Lifting operation
from the manual, the same would be discussed,
agreed and documented with the authorised Client
representative on site.
SPMT Engineering
Transport drawings for each module were created
keeping in mind recommendations from the
client. Three point longitudinal triangle and four
point rectangular hydraulic configurations were
considered for most of the transport operations.
Suggestions from Fagioli site team were always
respected and accommodated wherever possible.
Lifting Plan
Crane lift plans were studied well in advance
and was finalised to consider minimum change
in configurations. Also the cranes to be used in
different areas of the Tangguh Expansion project
were identified and implemented well in advance
for maximum utilization of the resources. Picture 12 - Lifting operation (Detail)
Rigging Arrangement Considering the long mobilization period for the
items to Tangguh site, it was made sure that all
Rigging arrangement drawings were prepared rigging design were performed considering the Picture 13 - Detail of the
considering maximum safety and best practices. items available at site rotation of the item
Impiantistica Italiana - Settembre-Ottobre 2019 47 47