Page 34 - Impiantitica industriale
P. 34
BEST PRACTICES
• A Quality Requirements Specification or
“QRS”
Containing the quality management system,
inspection and testing activity
• An Equipment Data Sheet Template
Containing the options, the purchaser wishes
to select, and project and design require-
ments
Comparing the two methods of equipment and
materials engineering and procurement, we find
the two following approaches:
“The actual way” of procuring equipment
“The JIP33 way” with standard specs:
30 Impiantistica Italiana - Marzo-Aprile 2021