Page 30 - Impiantistica Industriale
P. 30
ENGINEERING
Transport, lifting
and vertical installation
of a 458 T reactor
Pict .01
A challenging project Rudy Corbetta, Publicity Officer e With its know-how, top
level engineering and
Marketing Manager
executed in Italy by Fagioli Fagioli SpA “multi-purpose heavy lifting
A by itself on a ‘door-to-
in about 4 months challenging project was equipment, Fagioli is able
to provide all the services
executed by Fagioli for the
transport, verticalization and
door’ basis - from the
final installation of a 458 ton
reactor in Ravenna, for the
Polynt refinery in Italy.
The project was operationally executed factory to the site
in a range of time of about 4 months not
considering all the technical and enginee- foundation), Fagioli with its know-how, top
ring studies and documents issued before. level engineering and multi-purpose heavy
When it comes to apply the so called lifting equipment is the company able to
“door-to-door” definition (from factory to provide all the services by itself.