The main concerns for this project was the final in-  motely controlled, with a capacity of up to 60 ton
            stallation of a reactor in a “living” refinery site with all   for each axle line and with hydraulic suspensions,
            the restrictions involved in situations like this one:     and a unique  flexibility of steering options with each
            constrained area; overcoming all the obstacles du-  wheel bogie able to swing through 260° (+130°).
            ring the operation; maintaining the highest level of   Once arrived outside the reactor was positioned
            safety precautions.                       into a storage are onto some stools. (pict.01).

            The reactor                               On-site operations

            The huge item called R1101, was 27.6 meters   As already mentioned before, the main demanding
            long, 8.3 meters wide and 8.3 meters high, with an   aspects for the installation of this reactor was the
            overall weight of about 457.5 ton. Dimensions of   restricted area in which the vessel was supposed
            the reactor compelled Fagioli to find some inventive   to be positioned.
            solution to handle the load during the transport and   Fagioli engineering department  came up with the
            the installation phase.                   idea to execute a vertical installation of the vessel in
                                                      order to overcome all the obstacles which did not
            Sea transport activity                    allow a standard installation methodology: cros-
                                                      sing a pipe rack containing methane and cables
            The reactor, was built by Walter Tosto in Ortona.   used for production. Moreover, the dimensions and
            Fagioli was in charge of the transport and load   weight of the item did not allow the positioning of a
            out of the reactor onto a dedicated group-owned   sufficiently powerful crawler crane to be utilized for
            barge as well as the sea-fastening and ballasting   the final installation operation due to the restricted
            operations. Once the item was loaded and secu-  space within the refinery.
            red onto the barge, it was sea transported up to
            Ravenna port.                                 The Fagioli engineering
                                                          department came up with the
            Heavy haulage transport  “idea to execute a vertical
            up to the site                                installation of the vessel in

            The reactor was unloaded at Ravenna port and the   order to overcome all the
            road transport was executed by No. 36 axle lines   obstacles which did not
            SPMTs up to site. SPMTs (Self-propelled modular   allow a standard installation
            transporters) are multi-axle trailers designed for the
            transportation of large and heavy cargoes, desig-  methodology
            ned in modular construction which means that they
            could be coupled side to side and end to end, re-



































                                                                                                Pict .02


                                                                                   Impiantistica Italiana - Maggio-Giugno 2023  27