        Pict .08






















                                                                      were disconnected and removed. No.4 other Skid
                                                                      shoes were positioned onto some transversal skid
                                                                      tracks (90 degrees). Skid shoes for transversal mo-
                                                                      vement, were skidded under the support frame
                                                                      (where the reactor was stored) and took the load of
                                                                      the heavy item. Skid shoes are provided with inter-
                                                                      nal jacks able to lift the base where the item is leant
                                                                      with a useful stroke which can adjust the correct
                                                                      height to take and secure the whole load without
                                                                      any unforeseen movements.
                                                                      Once the reactor was connected to the “transver-
                                                                      sal” skid shoes, it was  eventually skidded, reaching
                                                                      the  foundation area (pict.09). Once checked that
       Pict .09                                                       the reactor was in correct position, it was lowered
                                                                      by means of the skid shoes lowering stroke system
                                                                      and bolted. Fagioli equipment was then discon-
                                                                      nected and removed (pict.10).

                                                                      Final conclusions

                                                                      This was a milestone operation for Fagioli. In terms
                                                                      of engineering and heavy haulage and lifting opera-
                                                                      tions, Fagioli was compelled to find the perfect and
                                                                      zero-accident solution for the transport and instal-
                                                                      lation of the 458 ton reactor. Fagioli door-to-door
                                                                      operation including the transport and  installation
                                                                      from manufacturing area up to foundation utilized
                                                                      an extensive fleet of up-to-date equipment:  group-
                                                                      owned barge; SPMTs;  high capacity crawler crane;
                                                                      skidding system. Fagioli engineering department
                                                                      planned and built the structures able to join the
       Pict .10
                            skid shoes, Fagioli operators started to move the   different equipment: tailor made tailing frame sy-
                            item during the skidding phase. The skid shoes   stem to be connected to the SPMTs and the reac-
                            were aligned onto the skid tracks for the execution   tor base frame; squared skidding frame structure
                            of an horizontal movement. This was the first ope-  for the insertion of the vessel; support shelves and
                            ration onto the skid tracks (pict. 08).   clamps to secure the item. Know-how, engineering
                                         Once reached the storage area   and equipment were the keystones for this innova-
           Zero accidents at the         at the end  of the horizontal  skid   tive solution for the vertical installation of a reactor
           end of this demanding         tracks, Fagioli proceeded with the   in such a restricted area.
                                         gradual release of the load (20%)
      “initiative                        onto support shelves previously   This  project  was  also  awarded  in  the  “INNOVA-
                                         set up. The first thing to be che-  TION” category by ESTA, the leading European
                                         cked was the condition of the   association  for  the  abnormal  road  transport  and
                            item and of the skidding system, if there were no   mobile crane rental industry.
                            interferences or anomalous deformations occurred
                            during the horizontal movement.           At the end of this demanding “adventure”, ZERO
                            The skid shoes used for the horizontal operations   ACCIDENTS occurred on site.


       30  Impiantistica Italiana - Maggio-Giugno 2023