Page 34 - Impiantistica Industriale
P. 34
ENGINEERING
Pict .08
were disconnected and removed. No.4 other Skid
shoes were positioned onto some transversal skid
tracks (90 degrees). Skid shoes for transversal mo-
vement, were skidded under the support frame
(where the reactor was stored) and took the load of
the heavy item. Skid shoes are provided with inter-
nal jacks able to lift the base where the item is leant
with a useful stroke which can adjust the correct
height to take and secure the whole load without
any unforeseen movements.
Once the reactor was connected to the “transver-
sal” skid shoes, it was eventually skidded, reaching
the foundation area (pict.09). Once checked that
Pict .09 the reactor was in correct position, it was lowered
by means of the skid shoes lowering stroke system
and bolted. Fagioli equipment was then discon-
nected and removed (pict.10).
Final conclusions
This was a milestone operation for Fagioli. In terms
of engineering and heavy haulage and lifting opera-
tions, Fagioli was compelled to find the perfect and
zero-accident solution for the transport and instal-
lation of the 458 ton reactor. Fagioli door-to-door
operation including the transport and installation
from manufacturing area up to foundation utilized
an extensive fleet of up-to-date equipment: group-
owned barge; SPMTs; high capacity crawler crane;
skidding system. Fagioli engineering department
planned and built the structures able to join the
Pict .10
skid shoes, Fagioli operators started to move the different equipment: tailor made tailing frame sy-
item during the skidding phase. The skid shoes stem to be connected to the SPMTs and the reac-
were aligned onto the skid tracks for the execution tor base frame; squared skidding frame structure
of an horizontal movement. This was the first ope- for the insertion of the vessel; support shelves and
ration onto the skid tracks (pict. 08). clamps to secure the item. Know-how, engineering
Once reached the storage area and equipment were the keystones for this innova-
Zero accidents at the at the end of the horizontal skid tive solution for the vertical installation of a reactor
end of this demanding tracks, Fagioli proceeded with the in such a restricted area.
gradual release of the load (20%)
“initiative onto support shelves previously This project was also awarded in the “INNOVA-
set up. The first thing to be che- TION” category by ESTA, the leading European
cked was the condition of the association for the abnormal road transport and
item and of the skidding system, if there were no mobile crane rental industry.
interferences or anomalous deformations occurred
during the horizontal movement. At the end of this demanding “adventure”, ZERO
The skid shoes used for the horizontal operations ACCIDENTS occurred on site.
30 Impiantistica Italiana - Maggio-Giugno 2023